Alpha ESS Storion-T100 Руководство по установке - Страница 18
Просмотреть онлайн или скачать pdf Руководство по установке для Хранение Alpha ESS Storion-T100. Alpha ESS Storion-T100 18 страниц. Energy storage system
INSTALLATION
05
START-UP AND OPERATION
Please refer to the Operation Manual for details.
06
REMOVE THE COMMUNICATION SHORTING SCREW
When the system is running normally and the system starts commission, remove the
communication shorting screw on the PCS (terminal 1, 2). For the detailed commission
steps, refer to the Commission List.
Figure 6-1 Remove the communication shorting screw
Note: Don't throw away the communication shorting screw, find a bag and maybe we
use it later.
07
CONTACT
31
32
If you have technical problems with our products, please contact the service hotline,
contact information is under the IMPRINT catalog at the beginning of this manual.
Please provide the following information to help you with the necessary assistance:
A.
Equipment model
B.
Serial number
C.
Battery type and number, or PV modules number and string type.
D.
Communication type
E.
Firmware version
F.
Error number and error message
START-UP AND OPERATION