Epever RTU 4G A Краткое руководство по эксплуатации

Просмотреть онлайн или скачать pdf Краткое руководство по эксплуатации для Сенсорные терминалы Epever RTU 4G A. Epever RTU 4G A 2 страницы. Gprs transmission terminal
Также для Epever RTU 4G A: Краткое руководство по эксплуатации (2 страниц)

HUIZHOU EPEVER TECHNOLOGY CO., LTD
※ Thanks for selecting the EPEVER RTU 4G A solar wireless collector.
Please read this manual carefully before using the product.
※ Please keep this manual for future reference.
GPRS Transmission Terminal
1. Important Safety Instructions
Read the instructions and warnings in the manual carefully before
installation.
The product should be situated away from the rain, exposure, dust,
vibration, corrosion, and intense electromagnetic environment.
Please avoid water and other liquids enter into the product.
Never use the product at sites where electrostatic could occur, and avoid
the antenna close to a metal object.
DO NOT disassemble or attempt to repair the product.
Power supply: DC 9~60V or 5V, it can be customized according to
customers' requirements.
Enable GPRS service for the SIM card before installation.
2. Overview
EPEVER RTU 4G A is a new wireless data transmission terminal based on
the 4G network. With the GSM/GPRS SIM card, the connected devices can
easily access the EPEVER cloud server to realize remote, wireless, and
networked communication. EPEVER RTU 4G A is suitable for EPEVER solar
controller, inverter, and inverter/charger.
Features:
Extensive network coverage and flexible networking
Low operating costs (charged by network flow)
Adopt a non-standard DB9 male terminal
Embedded in Modbus RTU protocol
Automatic restore after disconnection
Support RS485 communication
3. Appearance
❶ Antenna port
❷ Hole
★The pin definition of the terminal(DB9 female) connected to the DB9
male terminal❸ is as follows.
Item
Indicators
You can observe the indicators' color and status through the hole❷.
Name
Color
Network indicator
On solid
Red
(LED2)
EPEVER RTU 4G A
❹ Fixing screws
❸ DB9 male connector★
Terminal
Definition
1/2
NC
Floating
3
VCC2
Power2 (12V/200mA)
4
GND2
Power GND2
5
GND1
Power GND1
6
NC
Floating
7
RS485-A
RS485-A
8
RS485-B
RS485-B
9
VCC1
Power1 (5V/400mA)
Status
Instruction
Correct power supply
Not registered to the network
Slowly
Successfully
registered
1
TEL: +86-10-82894896/82894112/+86-752-3889706
Sync. Indicator
(LED1)
Power indicator
(LED2)
4. Parameter Configuration
Step1: Connect the DB9 male connector ❸ to the PC through a DB9 to USB
adapter.
Note: Connect an external power adapter to the DB9 female terminal to supply the
EPEVER RTU 4G A.
Step2: Insert the SIM card and power on the EPEVER RTU 4G A. For detailed
SIM card installation, refer to chapter 6, Installation.
Step3: Open the configuration tool on the PC and click the "connect" button
to connect the EPEVER RTU 4G A successfully.
Step4: Click the "Read" and "Write" buttons to configure the parameter.
Step5: After configuring, power on the product again to make the modified
parameters take effect.
Common configuration parameters:
Parameters
Server Info
APN
APN User
APN Key
Baud
5. System Connection
EPEVER RTU 4G A can be applied to the following solar street light systems.
Through a 2G/3G/4G signal, users can easily monitor the operating status and
modify the related parameters on the Cloud platform.
Note: The EPEVER RTU 4G A supports 5~18V DC power. While a larger transient
current is needed when the wireless network sends the data, it is suggested to
adopt a power adapter of DC 5v/500mA or above.
6. Installation
Step1: Install the SIM Card
① Purchase a SIM card and activate the GPRS service.
② Undo the three screws from the EPEVER RTU 4G A.
③ Push the shell upward and take out the circuit board.
④ Take out the small SIM card and insert it into the card slot correctly.
⑤ After installing successfully, reinstall the product shell.
Step2: Install the silicone pad
Tear off the silicone pad's adhesive and stick the silicone pad to the DB9
terminal of the EPEVER RTU 4G A.
to
the
flashing (5s)
network
Slowly
Successfully
Green
flashing (5s)
network
Turn off after
Green
Correct power supply
a flashing
Configuration
No modifications are recommended
Different countries have different APN, and please make sure APN
firstly. Products will not be connected to the Internet with fault APN.
China APN: CMNET
Enter it according to the actual
Enter it according to the actual
Set it according to the connected controller or inverter
Insert the SIM card in the direction
2
Website: www.epever.com
registered
to
the