EPHESUS Stadium Руководство по установке - Страница 4
Просмотреть онлайн или скачать pdf Руководство по установке для DJ оборудование EPHESUS Stadium. EPHESUS Stadium 16 страниц. Stadium series
Installation Instructions - Stadium Series
Stadium 1000 Current Draw
Voltage (Volts AC)
Current (Amps)
240
277
347
480
Table 3.
Power Quality
The voltage on the lighting circuits must stay within 3% of nominal at 60Hz. Voltage that is consistently too high or low shall
be corrected before LED luminaires are installed.
If you require assistance in checking your power system or designing or implementing solutions, contact Eaton's Electrical
Engineering Services and Systems. Find more information at www.eaton.com.
Installation
Step 1 – Mount The Luminaire
The first step is to attach the luminaire to the mounting structure. The mounting structure may be a light pole cross arm, an
indoor catwalk bracket, or other structural component that will hold the fixture in place. Refer to photometric drawings or
project Installation Drawings for luminaire installation locations and any additional mounting instructions.
It is the responsibility of the installer to verify that all proposed mounting structures including poles, cross arms,
catwalk brackets, and other mounting structures are certified to support the weight of the luminaires, withstand
wind loads, and meet all other applicable codes and regulations. FAILURE TO FOLLOW THIS WARNING MAY LEAD TO
DEATH, SEVERE INJURY, OR PROPERTY DAMAGE.
Do not suspend any luminaire by electrical or control wires, as these will not support the weight of the fixture,
resulting in the potential for the fixture to fall and cause damage or injury. FAILURE TO FOLLOW THIS WARNING MAY
LEAD TO DEATH, SEVERE INJURY, OR PROPERTY DAMAGE.
Equipment Required:
Mounting Hardware
●
●
Socket wrenches and/or crescent wrenches sized to fit mounting hardware
●
●
Cable ties or wire management – For outdoor installations use UV rated.
●
●
Before installation, verify there are no obstructions in the designed luminaire locations and light paths. If beams,
●
●
rigging, or any other obstructions are present, shift the mounting location up to +/-2' in either direction to install the
fixtures in the closest available location to provide a clear conical light path from the fixture to a 20' diameter circle
around the aiming point that is completely free of obstructions.
All LED arrays in each fixture must have clear line of sight to aiming area. Do not install fixture partially obscured.
●
●
Hardware Required
Hex bolt
Flat washers
3/4" ID
Hex Locknut
Table 4. Mounting Hardware Required
Mounting hardware shall be stainless steel or other high-strength, corrosion-resistant material. Length of Hex bolt shall be
determined in the field, size the bolt appropriately to allow secure fastening of the luminaire to the mounting structure.
4
EATON
IB528002EN
5.7
4.9
4.0
3.0
Size
Quantity per luminaire
3/4"
1
2
3/4"
1
Installation instructions rev 20171011
WARNING
WARNING