EPHREM LE CARRE Инструкции по сборке
Просмотреть онлайн или скачать pdf Инструкции по сборке для Печь EPHREM LE CARRE. EPHREM LE CARRE 2 страницы.
L E C A R R É
69
70
42
25
50
80
⑦
③
③
④
F
Position the narrower
E
B
side of the element
towards the back
C
EXPLODED VIEW
WARNING: DO NOT USE ALCOHOL, GASOLINE, OR SIMILAR FLAMMABLE LIQUIDS TO IGNITE OR REKINDLE THE FIRE
24
31
5
20
73
93
⑥
④
⑤
⑤
D
①
1
A
Total weight: 320kg
Packaged on a pallet measuring 100×120 cm
A S S E M B LY I N S T R U C T I O N S
INCLUDED ACCESSORY
Steel door
Step 1:
Trim elements if needed with a wood rasp.
Step 2:
Build a concrete slab measuring at least 110 (width) x 110 (depth) x 10 (thickness) cm and
let it dry for at least 15 days. Create a thin bed of
cement (the recommended ratio is one part cement to six parts sand). Place the 6 base slabs
Ⓐ
moistened beforehand (labeled
aligned and that the top surface is leveled. Remove any excess mortar from around the base.
Allow the floor to dry for 24 to 48 hours before proceeding.
Step 3:
Position the rear components
④
Step 4:
Join the side elements
⑥
Step 5:
Position the smoke drain
⑦
Step 6:
The marking
represents the location for the start of the chimney, which can be
created in two ways:
• Using flue tiles measuring 20x20 cm (for the 3
required)
• Alternatively, by installing a connection pipe (available as an optional accessory) and
connecting a stainless steel flue with an inside diameter of Ø200 mm.
Step 7:
Build a wall surrounding the oven using 10 cm bricks or breeze blocks, ensuring a 5 cm
gap is maintained between the wall and the oven, and a 7 cm gap in the depth.
Step 8:
Wrap the oven with flexible rolls of rock wool/ceramic wool (10 cm thickness) or opt for
Ephrem fibre insulation (available as an additional option). Afterward, cover the insulation layer
with:
• Either a generous 15 cm layer of vermiculite concrete,
• Or use 0/4 dry sand to reach a height of 15 cm above the oven arches.
Step 9:
Build a protective shelter for the oven to shield it from the elements, ensuring there is
approximately a 20 cm gap between the shelter and the top of the oven insulation, creating a
decompression chamber with vents.
For domestic use only
①
lean mortar
(2 to 3 cm thick) using standard
Ⓕ
to
) on top of the mortar bed, ensuring they are properly
③
according to the indicated arrangement.
⑤
and the two front elements
together without jointing them.
on a bed of
refractory
mortar.
rd
tile and upwards, additional support is