CREE LIGHTING EDGE ARE-EDG-R3 Инструкции по установке - Страница 2
Просмотреть онлайн или скачать pdf Инструкции по установке для Наружное освещение CREE LIGHTING EDGE ARE-EDG-R3. CREE LIGHTING EDGE ARE-EDG-R3 2 страницы. Led area post top mount
4
Hub Cover
(4) Mounting Bolts
STEP 2:
After feeding power supply cord up through
square hub, tie upper portion of cord into a knot
so that the cord cannot be pulled back through
the hub. The knot, being held in the hub, will
support the full weight of the power supply
cord running down the pole, and will relieve any
pressure on the connections made inside the
hub.
NOTE: If mounting to 4" square aluminum pole
ELECTRICAL CONNECTIONS:
PHASE to NEUTRAL WIRING – 120/277V
STEP 1:
Make the following electrical connections:
a. Connect supply ground conductor to fixture (green) ground wire
and mounting plate (green) ground wire with wire connector.
b. Connect supply voltage conductor to fixture black wire with
wire connector.
c. Connect supply neutral conductor to fixture white wire with
wire connector.
ELECTRICAL CONNECTIONS:
PHASE to PHASE WIRING – 208/240/480V
STEP 1:
Make the following electrical connections:
a. Connect supply ground conductor to fixture (green) ground wire
and mounting plate (green) ground wire with wire connector.
b. Connect supply L2 (Hot) conductor to fixture black wire with wire
connector.
c. Connect supply L1 (Hot) conductor to fixture white wire with wire
connector.
© 2019 Cree Lighting, A company of IDEAL INDUSTRIES. All rights reserved. For informational purposes only. Content is
subject to change. See www.creelighting.com/warranty for warranty and specifications. Cree
trademarks of Cree, Inc. THE EDGE
®
is a registered trademark of Cree Lighting, A company of IDEAL INDUSTRIES.
2 of 2
with a 1/4" wall, discard two shims provided
with luminaire.
STEP 3:
Remove (4) mounting bolts located around the
bottom of the square hub and set bolts aside to
reinstall later. Slide the luminaire hub into the
4" square shaft. See Figure 4.
STEP 4:
Secure luminaire to shaft by tightening the (4)
and the Cree logo are registered
®
3
mounting bolts, that were removed in Step 3,
from the outside of the shaft. Torque bolts to
140 in-lbs. (16 N-m).
STEP 5:
Make wiring connections per Electrical
Connection section.
STEP 6:
Replace hub cover that was removed in Step 1
after completing electrical connections.
www.creelighting.com
CI088X02R3_B