ABB C1900 Series Руководство по эксплуатации - Страница 3

Просмотреть онлайн или скачать pdf Руководство по эксплуатации для Измерительные приборы ABB C1900 Series. ABB C1900 Series 12 страниц. Circular chart recorder and recorder/controller
Также для ABB C1900 Series: Руководство по установке (20 страниц), Руководство пользователя (20 страниц), Руководство по эксплуатации (20 страниц), Руководство по установке (20 страниц), Руководство по установке (16 страниц)

ABB C1900 Series Руководство по эксплуатации
CONTENTS
1
INTRODUCTION..................................................................1
1.1
About this Manual..................................................... 1
1.2
Application Overview ............................................... 2
2
ELECTRICAL INSTALLATION ............................................ 4
2.1
Electrical Connections ............................................. 4
3
SETTING UP ....................................................................... 6
3.1
Fitting the Chart........................................................ 6
3.2
Fitting the Pen Capsule(s)....................................... 6
4
ALARMS ...............................................................................7
4.1
Delayed High/Low Process Alarm ......................... 7
5
CONFIGURATION .............................................................. 8
5.1
Default Configuration .............................................. 8

1 INTRODUCTION

1.1 About this Manual

This Supplementary Manual provides an overview of the use of
the C1900 Circular Chart Recorder on a Dairy Farm and
describes the electrical connections and special alarm feature
designed for this application, together with chart and pen
replacement.
For all other installation, operating and programming
information, refer to the appropriate manual:
IM/C1900-INS
Installation Guide
IM/C1900-OGR
Operating Guide (Recorder)
IM/C1900-OGC
Operating Guide (Controller)
IM/C1900-PGR
Programming Guide (Recorder)
IM/C1900-PGC
Programming Guide (Controller)
1