AccuTemp XLR8 Руководство по установке и эксплуатации - Страница 12
Просмотреть онлайн или скачать pdf Руководство по установке и эксплуатации для Промышленное оборудование AccuTemp XLR8. AccuTemp XLR8 13 страниц. Upper heated platen
5. PLANNED MAINTENANCE CHECKLIST
It is recommended that you contact your AccuTemp authorized service provider to setup a planned
maintenance program to keep your equipment operating in the most efficient manner. AccuTemp
recommends a minimum of a yearly schedule.
PM TASK DESCRIPTION
Verify that the equipment is level and properly located under the
hood.
Verify that the temperature controller is working properly and
that there are no rips in the label.
Inspect the control compartment for foreign particulate and any
loose wiring or connections.
Check that the power supply cord is not frayed, outer covering
is not degraded or any bare cooper is visible. Replace if required.
Verify amp draw to listed amp requirements on the data tag of
the equipment.
Verify mounting fasteners are in place and tight. If not correct. If
the stand has casters check that the wheels are intact and that
they are mounted correctly. If grease covered clean with a mild
detergent and clean water. Dry completely. Apply a food grade
silicone to the locking mechanism.
After all metallic areas are cool to the touch, clean external
metal surfaces except the cooking surface. With a damp clean
towel saturated with a mild detergent and clean water. Dry with
a clean dry towel.
SP8144-2011
XLR8 Installation & Operation Manual
Daily
Biannual
X
X
X
X
X
X
X
X
X
X
X
Yearly
X
X
X
X
X
X
X
11