ActronAir ERQ5-21AS Руководство по установке и вводу в эксплуатацию - Страница 13
Просмотреть онлайн или скачать pdf Руководство по установке и вводу в эксплуатацию для Аксессуары для кондиционеров ActronAir ERQ5-21AS. ActronAir ERQ5-21AS 20 страниц. Esp platinum que split ducted unit - 3 phase
Installation and Commissioning Guide
07. Safety Drain Tray
NOTE
• Refer to indoor unit dimension page for specification of drain connectors .
• Test condensate drain installation to ensure that the water flows freely and does not leak. Also check that the drain tray does
not overflow.
Suggested Minimum Slope to Ensure Correct Drainage
25MM
Suggested P- Trap Connection with Limited Height Clearance
Suggested P- Trap Connection with Long Drain Running
ActronAir is constantly seeking ways to improve the design of its products, therefore specifications are subject to change without notice.
CLAMP
BANDS
P.V.C
ELBOW
CLEAR
PLASTIC
INSPECTION
TUBE
P-TRAP
P.V.C
ELBOW
RETURN AIR
INDOOR COIL
INDOOR COIL
INTERNAL CONDENSATE TRAY
SUPPLY AIR
Copyright © 2019 Actron Engineering Pty. Ltd.
DESIGNS AND SPECIFICATIONS ARE SUBJECT TO CHANGE WITHOUT NOTICE.
ESP Platinum QUE - Three Phase
CONDENSATE AND SAFETY TRAY
REVISION DATE
05 - 05 - 2010
PREFERRED METHOD
OF CONNECTING P-TRAP
ENSURE DRAIN PIPES
SLOPE DOWN FROM THE
FAN COIL AT A MINIMUM
OF 10MM PER METRE
CONDENSATE DRAIN
CONNECTION
CONDENSATE DRAIN MUST BE
RUN SEPERATLY FROM THE
SAFETY TRAY DRAIN
SAFETY TRAY DRAIN
CONNECTION
THE TOP OF THE P-TRAP
MUST BE 50MM BELOW THE
TOP OF THE CONDENSATE
DRAIN CONNECTION
THE TOP OF THE P-TRAP
MUST BE 50MM BELOW THE
TOP OF THE CONDENSATE
DRAIN CONNECTION
DRAINAGE
DRAWING NUMBER
DFDRAIN - 100505
15MM
SEAL WITH
SILICONE
SEALANT
INSTALL A T-PIECE AS AN
AIR VENT FOR LONG DRAIN RUNS.
13