Cisco 12008 GSR Справочный материал - Страница 4
Просмотреть онлайн или скачать pdf Справочный материал для Сетевой маршрутизатор Cisco 12008 GSR. Cisco 12008 GSR 17 страниц.
20614 Cisco Installing and Maintaining Routers Part 4: 12000 GSR Series and XS5032 Modules
Cisco 12000 Series GSR: Troubleshooting
Startup Problems: Identifying (ULT 171): Identify Cisco 12000 Series Gigabit Switch Router (GSR) startup
problems.
Power Subsystem: Troubleshooting (ULT 172): Identify guidelines for troubleshooting the power
subsystem.
Processor Subsystem: Troubleshooting (ULT 173): Identify guidelines for troubleshooting the processor
subsystem.
Cooling Subsystem: Troubleshooting (ULT 174): Identify the guidelines for troubleshooting the 12000
series GSR cooling subsystem.
Cisco 12012: Running Diagnostics (ULT 175): Identify the steps involved in loading and running
diagnostics.
Catalyst 3000 and 5000 Router Modules
Catalyst 3000 Router: Installation
WS−X3011 Router Module: Overview (ULT 212): Identify the characteristics of the WS−X3011 router
module.
Router Card: Installing (ULT 213): Sequence the steps involved in connecting to the router console after
installing the router card.
Router Card: Network Connection (ULT 214): Identify the methods for connecting the router card to a
network.
Router Card: Configuring (ULT 215): Identify the steps involved in configuring the router card.
Catalyst 5000 RSM: Installation
Catalyst 5000 Series Switch Architecture (ULT 221): Identify the characteristics of Catalyst 5000 series
switch architecture.
RSM: Installing (ULT 222): Identify the steps involved in installing the Route Switch Module (RSM).
RSM: Configuring for Inter−VLAN Routing (ULT 223): Identify guidelines for configuring the Route
Switch Module (RSM) for Inter−VLAN routing.
User Interface: RSM Command Modes (ULT 224): Identify each of the Route Switch Module (RSM)
command modes and their access methods.
Catalyst 5000 RSM: Configuring
Session Command: Using (ULT 231): Identify the functions of the session command.
RSM: Booting for the First Time (ULT 232): Identify the phases involved in booting the Route Switch
Module (RSM) for the first time.
RSM: Configuration Task List (ULT 233): Identify the different Route Switch Module (RSM)
configuration tasks for Inter−VLAN routing.
4