Safety Considerations
The operative installing must ensure all the correct safety precautions have been taken into account
before starting. All legal regulations must be adhered to prior to commencing any works.
Installation should only be carried out by a skilled and qualified person and they must ensure they
are working under HSE guidance and rules, along with wearing the correct PPE and using the correct,
tested and inspected equipment. Provision of a suitable safe system of work is the responsibility of
the installing party.
When lifting is required, the operative installing should ensure they are fully trained in using lifting
equipment and ensure a safe working method is adhered to at all times. If slings are required, the
operative must ensure they are fully competent and qualified in line with LOLER regulations.
It is advised a risk assessment is completed and understood by the installer prior to commencing
works. Risk management and safety precautions should be put in place by the operative installing.
Common safety considerations also include:
-
Prevention of unauthorised access and vandalism/theft
-
Prevention of trapping during hoisting/maintenance
-
General construction installation hazards
-
If actuated, guards, emergency stops and isolation should all be installed as appropriate.
If in doubt, please contact Aquatic Control Engineering (ACE) for copies of the design-risk assessment
(DRA-APS-PE) for advice on suitable control measures.
Storage and handling of goods
Please also see Terms and Conditions of Sale regarding responsibility of storage and transport. This
product should be transported on a suitably sized pallet relating to the size of the Penstock. The
product should be moved horizontally only and may require correct lifting equipment.
Prior to installation, the APS-PE should be stored on a suitably sized pallet, supported flat on a
horizontal surface, and away from sources of damage, contamination and tampering.
Fixings that are supplied may also be provided in perishable containers (e.g. boxes) where these
should be stored in dry conditions, away from contamination, taking special attention to keep away
from other metals.
When handling goods, the equipment should be lifted either flat on a pallet (as delivered) or using
the designated lifting point at the top of the spindle.
Operation & Maintenance Manual
APS-PE Penstock