Cisco 7200 VXR Series Руководство - Страница 7
Просмотреть онлайн или скачать pdf Руководство для Беспроводная точка доступа Cisco 7200 VXR Series. Cisco 7200 VXR Series 14 страниц. Preparing for installation
Также для Cisco 7200 VXR Series: Информационный лист (12 страниц), Краткое руководство по эксплуатации (48 страниц)
Chapter 2
Preparing for Installation
When planning your rack installation, consider the following guidelines:
•
To prevent chassis overheating, never install the Cisco 7200 VXR in an enclosed rack or room that is not
Caution
properly ventilated or air-conditioned.
•
•
•
We strongly recommend that you provide a chassis ground connection. See the
Note
Ground Connection" section on page 3-17
instructions.
To properly install a Cisco 7200 VXR chassis in a rack, see the instructions in the
Cisco 7200 VXR Router" section on page 3-2
Temperature and Humidity Requirements
Table 2-1
those within which the Cisco 7200 VXR routers continue to operate; however, a measurement that is
approaching the minimum or maximum of a range indicates a potential problem. You can maintain
normal operation by anticipating and correcting environmental anomalies before they approach a
maximum operating range.
Table 2-1
Specification
Temperature, ambient operating
Temperature, ambient nonoperating and storage
Humidity, ambient (noncondensing) operating
Humidity, ambient (noncondensing) nonoperating
and storage
Altitude, operating, and nonoperating
Vibration, operating
Vibration, nonoperating
OL-5013-09
If you plan to use an equipment shelf, ensure that the shelf is constructed to support the weight and
dimensions of the chassis.
designing a customized shelf. We recommend that you use the rack-mount kit designed for
Cisco 7200 VXR routers.
Allow sufficient clearance around the rack for maintenance. If the rack is mobile, you can push it
back near a wall or cabinet for normal operation and pull it out for maintenance (installing or moving
port adapters, connecting cables, or replacing or upgrading components). Otherwise, allow 19
inches (48.3 cm) of clearance to remove Cisco 7200 VXR FRUs.
If you are planning to install the cable-management brackets on a Cisco 7200 VXR router that you
are rack-mounting from the front, you must install the cable-management brackets and the
rack-mount brackets before you install the chassis in the rack.
Provide an adequate chassis ground (earth) connection for your router chassis.
lists the operating and nonoperating environmental site requirements. The ranges listed are
Specifications for Operating and Nonoperating Environments
Figure 2-2
shows the chassis footprint, which you need if you are
in
Chapter 3, "Installing a Cisco 7200 VXR Router"
in
Chapter 3, "Installing a Cisco 7200 VXR Router."
Minimum
32°F (0°C)
–4°F (–20°C)
10%
5%
Sea level
5–200 Hz, 0.5 g (1 octet/min.)
5–200 Hz, 1 g (1 octet/min.)
200–500 Hz, 2 g (1 octet/min.)
Cisco 7200 VXR Installation and Configuration Guide
Site Requirement Guidelines
"Attaching a Chassis
for
"Rack-Mounting a
Maximum
104°F (40°C)
149°F (65°C)
90%
95%
6,500 ft.
(2000 m)
—
—
2-7