3Com Fast EtherLink XL PCI 10/100BASE-TX Краткое руководство по эксплуатации - Страница 5

Просмотреть онлайн или скачать pdf Краткое руководство по эксплуатации для Сетевая карта 3Com Fast EtherLink XL PCI 10/100BASE-TX. 3Com Fast EtherLink XL PCI 10/100BASE-TX 17 страниц. Fast ethernet switching modules for the corebuilder 9000 enterprise switch

3Com Fast EtherLink XL PCI 10/100BASE-TX Краткое руководство по эксплуатации
100BASE-FX and 10/100BASE-TX Fast Ethernet Switching Modules Quick Start Guide
CAUTION: Handle the module by the front panel only. Do not touch
any components, pins, leads, or solder connections.
If the module appears to be damaged, replace it in the antistatic bag,
place it back in the shipping box, and contact your local supplier.
Installation
Before you install the Switching Module in the CoreBuilder 9000
Prerequisites
chassis, make sure that the CoreBuilder 9000 chassis is properly
installed in a rack, on a table, or on a shelf, according to the
instructions in the CoreBuilder 9000 Enterprise Switch Getting Started
Guide.
You need a flat-head screwdriver to complete module installation.
3Com recommends that you install CoreBuilder 9000 modules in
the following order:
1 Enterprise Management Engine (EME) and Enterprise
Management Controller (EMC) Modules
By installing the management modules first, you can complete
the required system-level setup procedures before you add
other modules to the chassis. See the Enterprise Management
Engine Quick Start Guide and the Enterprise Management Controller
Quick Start Guide for additional information about these modules.
2 Switch Fabric Modules
Because you manage the Switching interface modules through the
switch fabric module backplane ports, you must install the switch
fabric modules before you install the Switching interface modules.
3 Interface Modules
Install interface modules, such as 1000BASE-SX and 1000BASE-LX
Gigabit Ethernet Interface Modules and the 100BASE-FX and
10/100BASE-TX Fast Ethernet Switching Modules, last.
5