5.2 Fuse replacement
Step 1
Step 2
Step 3
Step 4
Step 5
Step 6
Step 7
Step 8
Step 9
Step 10
Step 11
Step 12
Man-1556 Rev.02
FPC-2V2 Fire Extinguishant Controller Operation and Installation Manual
Power off the unit.
Turn Isolate Key Switch to "Off" position.
Disconnect the test lamps and ensure that the FirePro Generators fitted to
terminals.
Place the front frame of the panel.
Power on the unit.
Ensure that only the yellow Fault LED on the front panel and the internal
yellow LED marked LED5 are lit and the buzzer sounds.
Turn Isolate Key Switch to live position and ensure that the fault
indication clears.
The system recommissioning is completed.
Power off the unit.
Turn Isolate Key Switch to "Off" position.
Remove the front frame of the panel from the back box.
Flip the front panel frame on the PCB side.
Locate the fuse holder as indicated in Figure 10.
Lift the fuse cover and push the fuse to release it.
Replace the fuse with a 1.6A quick blow fuse.
Push the fuse in the fuse cover and secure it.
Push the fuse cover in the fuse holder and secure it.
Place the front frame of the panel to the back box.
Power on the unit.
Turn Isolate Key Switch to "Live" position