FirePro FPC-5V2 Руководство по эксплуатации - Страница 6

Просмотреть онлайн или скачать pdf Руководство по эксплуатации для Контроллер FirePro FPC-5V2. FirePro FPC-5V2 20 страниц. Panel fire protection controller

Step 5: Install the CR2 battery on the battery holder "J4".
Step 6: Use a multimeter to make sure that there is no voltage at terminal "J6" on the
electronic PCB. If there is a voltage reading, this means that the fire detection part of the
unit has been activated, which will trigger the activation of the condensed aerosol
generator when connected. Address this issue first and then proceed to the next step.
Step 7: Connect the Condensed Aerosol Generator wires
electronic PCB.
Step 8: To adjust the position of the "SW2" switch for Automatic or Manual monitoring
mode operation, unscrew the electronic PCB from the front section of the FPC-5V2
module.
Step 9: Place the front section of the FPC-5V2 module into the main body of the FPC-
5V2. Insert and tighten safety Knob "A" to assemble the unit.
FPC-5V2
Figure 9
Figure 10
Figure 11
Press Switch
Figure 12
April 2019
5 |
P a g e