DirectConnect Reel View DC100FS16x9 Руководство пользователя - Страница 4

Просмотреть онлайн или скачать pdf Руководство пользователя для Проекционный экран DirectConnect Reel View DC100FS16x9. DirectConnect Reel View DC100FS16x9 5 страниц. For 112 inch and 120 inch. reference studio fixed frame screens

2.0 Hardware List

(Actual parts, appearance and quantity may differ from illustration)
ID Quantity
Description
1
1
Screen
2
2
Top / Bottom Frame
3
2
Left / Right Frame
Top / Bottom Screen
4
2
Rods
Left / Right Screen
5
2
Rods

3.0 Required Tools

(Tools not included)
Phillips Screwdriver
Level for hanging the screen
ID Quantity
Description
A
2
Hanging Bracket
B
4
L Bracket
Material Tension
C
14
Tabs
D
2
Hanging Screw
E
16
L Bracket Screw
F
16
L Bracket Washer
4
Fig 5
Unroll the screen material (1) and gently place it on the ground (viewing
side down). Make sure the ground is clear of debris and dirt
Thread the metal rods (4,5) into each pocket located on the screen mate-
rial (1). Insert the two short rods (5) into the short side of the screen
material (1) and the longer rods (4) into the long side of the screen mate-
rial (1) as shown in (Fig 6)
Fig 6
7