Aerco Esteem 399 Руководство по эксплуатации - Страница 9
Просмотреть онлайн или скачать pdf Руководство по эксплуатации для Водонагреватель Aerco Esteem 399. Aerco Esteem 399 14 страниц. Low nox gas fired boiler
Face of Wall
Air Intake
Grade/Anticipated
Snow Line
Figure 5: Installation Requirements
• Termination must not extend more than
9-1/2 inches beyond the exterior wall as
shown in Figure 5.
4. Horizontal or vertical runs of the vent/air
system must be supported at every joint.
Use the Hanging Clamp (P/N 39108) or
perforated metal strap hangers or equiva-
lent to support the piping.
5. The vent/air system must terminate using
the horizontal termination supplied in the
kit.
6. The vent/air system must be pitched back
to the boiler at minimum 5/8 inch per foot
on any horizontal runs.
Boiler Vent /Air System Adapter
Install boiler vent/air system adapter over the
boiler vent and air outlets. Secure the vent/air
system adapter using the band clamps found
on the vent and air adapters of the boiler.
N
Ensure Vent/Air System Adapter is
properly oriented over the boiler adapt-
ers. The concentric outlet of the adapter
should be installed toward the top left
side of the boiler.
GF-125V
9 1/2"
12"
Min.
OTICE
Boiler Vent /Air System Adapter
Boiler Vent
Outlet Adapter
Figure 6: Assembly of Vent/Air Adapter
Vent/Air System Joint Assembly
1. When installing the vent system, the
female end of the pipe or fitting should
face up or away from the boiler.
2. Prior to assembly of any piping or fittings
ensure the inner pipe gasket seal is pres-
ent, undamaged and properly seated in
the groove of the pipe.
3. Moisten the gasket seal with clean water.
Insert and rotate the male end of the inner
pipe into the female end of the previous
pipe section.
N
To aid in the assembly of the pipes and
fi ttings use only clean water to moisten
the gasket and the mating end of the
pipe. Use a twisting motion as the pipe
ends are pressed together.
4. Push the sections together firmly until the
outer jacket bead of the new section has
made contact with the edge of the female
end of the previous section. When fully
assembled, the outer female end of the
previous section will overlap the male end
by approximately 1".
5. Use 2 self-drilling screws provided to
secure the outer sections together where
they overlap. Install screws 90º apart from
one another. No pre-drilling is required.
Vent/Air Adapter
Boiler Air
Inlet Adapter
Adapter Band Clamps
OTICE
5