Acorn Safety S0420-FRV Инструкции по установке, эксплуатации и техническому обслуживанию - Страница 2

Просмотреть онлайн или скачать pdf Инструкции по установке, эксплуатации и техническому обслуживанию для Сантехническая продукция Acorn Safety S0420-FRV. Acorn Safety S0420-FRV 5 страниц. Freeze resistant wall mounted emergency eye/facewash

Installation & Operation Manual

PRELIMINARY STEPS

1. Read the installation instructions prior to beginning the installation.
2. Separate parts from packaging and verify all necessary parts are accounted for and undamaged. Obtain missing or
damaged parts from Acorn Safety prior to beginning installation.
3. Flush water supply lines prior to installation. This will remove unwanted debris from the lines and prevent unwanted
blockages in the safety equipment.
4. In order to comply with ANSI Z358.1, the safety equipment must be inspected periodically. An inspection tag is provided for
documentation purposes.
5. All employees at risk of contamination should be informed and trained in the use of this and any other safety equipment.
The signage provided should be posted appropriately in close proximity to this equipment.
ROUGH-IN
S0420-FRV & S0440-FRV
1"
(25)
* 32 5 8 "
(829)
REF
MOUNTING DETAIL
Ø7/8" (22) OPENING
FOR 1/2" SUPPLY
5 1 4 "
(133)
*32 5 8 "
*29 3 4 "
(829)
(756)
FINISHED
FLOOR
GENERAL NOTES:
1. ALL DIMENSIONS ARE IN INCHES (MM).
*2. DIMENSIONS SHOWN ARE FOR REFERENCE FOR NORMAL ADULT HEIGHT. ANSI Z358. 1
REQUIRE NOZZLES TO BE BETEWEEN 33" AND 45" ABOVE THE FLOOR.
Acorn Safety
a division of Acorn Engineering Company™
Manual #7109-516-001
STRAINER
4x Ø 3/8" (10)
4 7 8 "
MTG HOLES
(124)
FINISHED
FLOOR
Ø1/2" (13) ACTIVATION
ROD OPENING
4 1 8 "
EYE/FACE
DISCHARGE
(105)
*37 3 4 "
(959)
*33 1 4 "
(845)
SUPPLY
14 1 2 "
(368)
Ø11 3 4 "
(298)
1 1 4 "
*39"
OD
(991)
TAILPIECE
FINISHED
WALL
Page 2 of 5
8"
(203)
REF.
1/4" NPT DRAIN
8 5 8 "
(219)
Revised: 06/01/2022
1/2" NPT
SUPPLY
DOWN VALVE