Armstrong Air BCS3M 18 Руководство по установке - Страница 13
Просмотреть онлайн или скачать pdf Руководство по установке для Воздухораспределители Armstrong Air BCS3M 18. Armstrong Air BCS3M 18 18 страниц. Bce3m series; bcs3m series
Check-out Procedures
NOTE:
Refer to outdoor unit installation instructions
for system start-up instructions and refrigerant charging
instructions.
PRE-START -UP CHECKS
•
Is the air handler properly and securely installed?
•
If horizontally configured, is the unit sloped up to 5/8
inch toward drain lines?
•
Will the unit be accessible for servicing?
•
Has an auxiliary pan been provided under the unit with
separate drain for units installed above a finished ceiling
or in any installation where condensate overflow could
cause damage?
•
Have ALL unused drain pan ports been properly
plugged?
•
Has the condensate line been properly sized, run,
trapped, pitched, and tested?
•
Is the duct system correctly sized, run, sealed, and
insulated?
•
Have all cabinet openings and wiring been sealed?
•
Is the indoor coil orifice metering device properly sized
for the outdoor unit being used?
•
Have all unused parts and packaging been disposed
of?
•
Is the filter clean, in place, and of adequate size?
•
Is the wiring neat, correct, and in accordance with the
wiring diagram?
•
Is the unit properly grounded and protected (fused)?
•
Is the thermostat correctly wired and in a good location?
•
Are all access panels in place and secure?
CHECK BLOWER OPERATION
•
The indoor blower should come on.
CHECK COOLING OPERATION
•
Set thermostat to force a call for cooling (approximately
5°F lower than the indoor ambient temperature ).
•
The outdoor and indoor units should come on
immediately.
•
Check the airflow from a register to confirm that the
system is moving cooled air.
•
Set the thermostat 5°F higher than the indoor
temperature. The indoor blower and outdoor unit should
cycle off. Air handler should cycle off 45 seconds after
the outdoor unit shuts off.
CHECK ELECTRIC HEATER (IF USED)
•
Set thermostat to call for auxiliary heat (approximately
5°F above ambient temperature). The indoor blower
and auxiliary heat should come on together. Allow a
minimum of 3 minutes for all sequencers to cycle on.
•
Set the thermostat so that it does not call for heat. Allow
up to 5 minutes for all sequencers to cycle off.
507120-01
Operation
COOLING (COOLING ONLY OR HEAT PUMP)
When the thermostat calls for cooling, 24 volts is put on the
blower time-delay relay coil and then the indoor blower relay
energizes. The normally open contacts close, causing the
indoor blower motor to operate. The circuit between R and
Y is completed, closing the circuit to the contactor in the
outdoor unit, starting the compressor and outdoor fan motor.
On heat pumps, circuit R and O energizes the reversing
valve, switching the valve to the cooling position. (The
reversing valve remains energized as long as the thermostat
selector switch is in the COOL position.)
At the completion of the cooling demand the indoor blower
and outdoor unit should cycle off. Air handler should cycle
off 45 seconds after the outdoor unit shuts off.
HEATING (ELECTRIC HEAT ONLY)
When the thermostat calls for heat, the circuit between R
and W is completed, and the heat sequencer is energized.
A time delay follows before the heating elements and the
indoor blower motor come on. Units with a second heat
sequencer can be connected with the first sequencer to W
on the thermostat subbase, or they may also be connected
to a second stage on the subbase.
HEATING (HEAT PUMP)
When the thermostat calls for heating, 24 volts is put on the
blower time-delay relay coil. Then normally open contacts
close, causing the indoor blower motor to operate. The
circuit between R and Y is completed, closing the circuit to
the contactor in the outdoor unit, starting the compressor
and outdoor fan motor. Circuit R and G energizes the blower
relay, starting the indoor blower motor.
If the room temperature should continue to fall, the circuit
between R and W1 is completed by the second-stage heat
room thermostat. Circuit R-W1 energizes a heat sequencer.
The completed circuit will energize supplemental electric
heat (if applicable). Units with a second heat sequencer
can be connected with the first sequencer to W1 on the
thermostat. They may also be connected to a second
heating stage W2 on the thermostat
subbase.
EMERGENCY HEAT (HEATING HEAT PUMP)
If the selector switch on the thermostat is set to the
emergency heat position, the heat pump will be locked out
of the heating circuit, and all heating will be electric heat (if
applicable). A jumper should be placed between W2 and E
on the thermostat subbase so that the electric heat control
will transfer to the first-stage heat on the thermostat. This
will allow the indoor blower to cycle on and off with the
electric heat when the fan switch is in the AUTO position.
Issue 1324
Page 13 of 18