Acorn Safety S0740 Инструкции по установке, эксплуатации и техническому обслуживанию - Страница 2

Просмотреть онлайн или скачать pdf Инструкции по установке, эксплуатации и техническому обслуживанию для Оборудование для обеспечения безопасности Acorn Safety S0740. Acorn Safety S0740 5 страниц. Deck mounted eye/facewash

Installation & Operation Manual

PRELIMINARY STEPS

1. Read the installation instructions prior to beginning the installation.
2. Separate parts from packaging and verify all necessary parts are accounted for and undamaged. Obtain missing or
damaged parts from Acorn Safety prior to beginning installation.
3. Flush water supply lines prior to installation. This will remove unwanted debris from the lines and prevent unwanted
blockages in the safety equipment.
4. In order to comply with ANSI Z358.1, the safety equipment must be inspected periodically. An inspection tag is
provided for documentation purposes.
5. all employees at risk of contamination should be informed and trained in the use of this and any other safety
equipment. The signage provided should be posted appropriately in close proximity to this equipment.
ROUGH IN
Ø11 1 2 "
(292)
HOLE
2 1 8 "
(54)
STRAINER
Acorn Safety
a division of Acorn Engineering
Manual #7109-104-001
Ø1 3 8 "
(32)
HOLE 2X
8 1 2 "
(216)
MIN.
13 3 4 "
(348)
Ø2 1 8 "
(54)
1/2" NTP
SUPPLY LINE
MALE
BY OTHERS
CONNECTION
Company
2"
(51)
1/2" NPT
BALL VALVE
6 3 8 "
(161)
3
4 "
7"
(19)
(178)
1/2" NTP
FEMALE CONNECTION
Page 2 of 5
4"
(102)
Ø6 1 8 "
(155)
Revised: 01/04/13
1 3 4 "
(43)