Blagdon PRO UVC 16200 Руководство мастера - Страница 5
Просмотреть онлайн или скачать pdf Руководство мастера для Системы фильтрации воды Blagdon PRO UVC 16200. Blagdon PRO UVC 16200 8 страниц. Green water clarifier
UVC_Pro_Inst_AW.qxd
5/2/08
11:33
INSTALLATION
MODULAR CONNECTION OPTIONS
PRO UVC Models 16200 (18w), 21600 (24w) and 32400 (36w) use the same contact chamber and pipe
work fittings and can be combined to create a modular system when used in conjunction with the
optional link pipe fittings set (included in the Modular 64800 2x 36w model) (see parts 21/22 on page 3).
Please see below for the range of configurations that can be achieved and chose the most suitable for
your installation requirements.
Modular fittings set complete (Code: 1050388) please see your retailer for details.
SINGLE
MODULAR TRIPLE
6
Page 5
MODULAR TWIN
INSTALLATION
IMPORTANT:
The inlet/outlet hose or solid pipe work should be installed over as short a distance as
possible with no kinks and the minimum number of bends. This will minimise flow restrictions and
back pressure on the pump resulting in the minimum loss of pump flow rate. Pro UVCs must cause
some restriction in the flow in order to work effectively, however this product has been specifically
designed to minimise this effect.
CONNECTING INLET HOSES
The recommended hose size for
your PRO UVC is stated in
Inlet to UVC
the UVC performance and
specification charts on page 3.
Always secure hose with a jubilee
clip. Warming the hose in a bucket
of boiling water can aid fitting.
Always ensure that the smaller
diameter hosetail is cut off and
removed to prevent reduced UVC performance.
Use the shortest possible hose lengths to minimise flow restrictions.
Avoid folds and kinks in the hose, which will reduce flow and UVC performance.
CONNECTING INLET/OUTLET
SOLVENT WELD SOLID PIPE WORK
Solvent weld waste pipe work cement should be used to permanently glue the connection.
1 /2
The Two female solvent weld 1
" (43mm) internal diameter solid waste pipe work connecters with
elbows provided should be cleaned with pipe cleaning fluid along with pipe the work to be inserted.
Always remove excess cement from the outside, and the inside of the pipe work immediately.
IMPORTANT:
The UVC has been designed to be operated when water is passing through
the contact chamber, always turn off the lamps if the pump system is not operational to
prevent overheating.
1
1 / 2
" (38mm)
Hose
Recommended
7