Blake Water Solutions MOD-420-BWS Инструкции по эксплуатации и установке - Страница 7

Просмотреть онлайн или скачать pdf Инструкции по эксплуатации и установке для Блок управления Blake Water Solutions MOD-420-BWS. Blake Water Solutions MOD-420-BWS 12 страниц. Equipment modules

Step 2) Plug the solenoid valve into the applicable electrical
outlet. At this stage, the functionality of the solenoid valve
can be tested by pressing the solenoid test button located on
the upper left of the circuit board. Manually depressing (and
holding) this button will complete the electrical circuit and will
open the normally closed solenoid valve. You should be able to
hear the activation of the solenoid valve at this stage to ensure
the valve is functioning properly (see Fig. 3).
Step 3) Make sure your UV controller is unplugged from the
power source. Once all these connections have been made,
affix the male IEP plug of the solenoid module cable into the
Figure 3
IEP port on the controller, or any other available IEP port such
Solenoid Test Button
as the UV sensor, 4-20 mA module or remote alarm module. It
does not matter which IEP port any module is attached to, as
long as they are attached.
BWS5/BWS6
BWS5-C/6-C
Sensor IEP
Series controllers
Installation
Series controllers
IEP
IEP
connection
connection
IEP
connection
OPERATION
Step 1) Plug the controller into the power source and make sure the solenoid module is
activated on the controller. During the start-up sequence, the SOLENOID MODULE screen will
indicate a "initialized" when the module is activated properly (see Fig. 4).
Figure 4
Solenoid
Activation
Screens
5 |
P a g e