CUBEX SKYMASTER III- 3B Руководство - Страница 3

Просмотреть онлайн или скачать pdf Руководство для Антенна CUBEX SKYMASTER III- 3B. CUBEX SKYMASTER III- 3B 13 страниц. Quad antennas

Instructions:
found in TABLE III.
2. To assure uniform drilling of any one type element set, the following procedure is
recommended. Select four (4) of the previously prepared arms and line them up side by
side with the butt end against a solid stop to assure common length and alignment.
Butt end
REMEMBER to allow for drilling THROUGH the arm by spacing the arm above the work
surface. Pieces of scrap wood positioned along the length of the arms will provide the
necessary clearance. Orient the arm assembly screws vertically and clamp the arms to
prevent them accidentally turning during the drilling process. Now using the dimensions in
Table III and measuring from the "butt" end mark each arm for each band. Recheck your
measurements and then proceed to drill through both sides of the arm with a 1/8" (3.1 mm)
drill bit. Mark the arms per their function (REFL, DRV, D1, D2) and set them aside.
4. The wire has been spooled in a relatively large diameter to minimize "curl" and reduce
the chance of kinking. The wire bundles are marked for as follows – Reflectors &
Driven Elements (2el, 3bands) WARC band Reflectors and Driven Elements
(12m/17m) are separately packaged. There are additional packages of wire for the
Directors as applicable. All wire lengths should be carefully un-spooled by rolling the
coil of wire in the appropriate direction.
A convenient device for helping to keep the wire manageable is a
plastic water "Pail" inverted. Its conical shape allows the wire spool to
slip over while providing support for the bundle.
5. A suggested method for winding accurate elements is to fabricate
a temporary winding jig consisting of a few lengths of 1" x 4" wood board stock for a
total length of about 20 feet (6 m). Mark the center of this board, and 1-1/4" (3 cm) on
either side. The center is used for Reflectors and Directors, and the two separated
points are for Driven Elements. Regular number 6pd finishing nails can be driven into
the board leaving about 1" or so protruding.
Cubex Co., Inc.
10m
PREPARATION OF WIRE ELEMENTS
Pg. 3
Cubex SkyMaster Series
15m
Refer to
TABLE III
20m
05-06 Rev 0