displayit Flare Инструкция по сборке Руководство - Страница 2
Просмотреть онлайн или скачать pdf Инструкция по сборке Руководство для Проекционный экран displayit Flare. displayit Flare 6 страниц. 20' (230” x 92”)
1. Upack the frame. Save all foam pieces for repacking later. Lay out the frame pieces as seen in Diagram 1.
Frame perimeter pieces are labeled with stickers matching Diagram 1 to make this step easier.
Take note where the velcro strips for the power supplies are located on Diagram 1.
Assemble the frame on its back.
46" TOP
CORNER
46" SIDE
CORNER
46" SIDE
CORNER
Corner with Longer Leg
Wire
Foot
46" BOTTOM
Pass-through
Holes
CORNER
2. Assemble frame top,
bottom, and sides using
six flat connecting brackets.
Hand tighten wing nuts to
secure.
Note: It's best to build the
frame laying on its back.
displayit.com
46" TOP
46" TOP
CENTER
CENTER
A
Future Support Pole
Locations
Velcro for Power Supplies
Foot Holes
Foot Holes
46" BOTTOM
CENTER
A
3. Connect the frame sides to the
frame bottom with two corner
brackets. Make sure the longer legs
of the corner brackets run along
the bottom frame piece. The holes
in the longer legs align with the
foot holes in the bottom of the
frame. Hand-tighten the wingnuts.
800.207.0311
After-Hours Emergency: Call or Text 678.723.5343
Assembly Instructions Page 2
46" TOP
CENTER
B
C
Foot Holes
46" BOTTOM
CENTER
B
Longer Legs
Align with
Foot Holes
4. Complete the frame
perimeter build by attaching
the top horizontals with top
corner brackets.
20' (230" x 92") Flare
46" TOP
CORNER
Diagram 1
Corner with Longer Leg
Wire
46" BOTTOM
46" BOTTOM
Pass-through
CENTER
CORNER
C
CAUTION:
METAL EDGES
MAY BE SHARP
Flare v3.2 Updated 9/4/2019
46" SIDE
CORNER
46" SIDE
CORNER
Foot
Holes