ClearSpan 104448 Руководство по эксплуатации - Страница 7
Просмотреть онлайн или скачать pdf Руководство по эксплуатации для Палатка ClearSpan 104448. ClearSpan 104448 15 страниц. Poly shelters sunblocker pavilion
Section C - Driving Posts (optional, recommended)
Step 1: Attach a tape measure hooking it over the top of the first post and attaching it with tape.
Run it down the long direction to the second post
Step 2: Proceed to drive all the other posts in line spacing them 8' center to center using the tape
measure. The string line should be 1" down from the tops of both corner posts. Drive the other
posts so their ends are also 1" above the string line. This will put all posts at the same height.
Notes: The tape measure should be long enough to measure the entire length of the shelter
without taking it off the first post. This will prevent a compounding of errors. With this method
you might be off on any given post, but the overall measurement should be right.
A certain amount of care should be used driving your posts. Keeping your posts 8' center to
center and vertical will make installing the rest of the structure that much easier.
Be sure to orient the pre-drilled holes in the posts as shown above to facilitate attachment to
baseboards (optional, supplied by customer) if desired.
Cutting posts as a rule is not recommended as they act as the foundation for the shelter. The
posts should be set into grade as indicated in the instructions. Exceptions do occur when a
post cannot be driven far enough into the grade because of rock or ledge that cannot be
broken through.
It is recommended that if the posts must be cut, first dig down to the obstruction with a 12"
round hole. Turn the post upside down placing the top of it on top of the obstruction. Mark the
bottom of the post at 1" above the string line and cut it on the mark. Fill the hole with concrete
and set the post into the concrete in the same location that it is to be driven into. If the hole is
shallow, dig it wide enough so that after the concrete hardens, it has good bearing against the
soil. Do not erect the rafter on top of the post until the concrete is dry.
Step 3: Repeat the above steps to drive all the posts along the other side of your shelter.
Step 4: Finish by installing a ground post in the middle of each end at the same height as all others.
Page 7