Dixon LGH5000-001 Инструкции по обслуживанию и эксплуатации - Страница 6

Просмотреть онлайн или скачать pdf Инструкции по обслуживанию и эксплуатации для Промышленное оборудование Dixon LGH5000-001. Dixon LGH5000-001 8 страниц. Guard bar hinge

These instructions and recommendations are provided to ensure proper operation and long
service life of the Dixon "Bayco" guard bar hinge. Parts are identified by the item numbers
on the assembly drawings and parts list.
The Dixon "Bayco" guard bar hinge set includes a left subassembly and a right
subassembly, which are pre-assembled in the factory. The guard bar hinge set includes
two elbows (14) that can be welded onto the guard bars or tubes. The guard bars or tubes
are supplied and welded on site by the customer.
The Dixon "Bayco" 5000AIHD is a high flow air interlock valve. It is to be used with the
Dixon "Bayco" guard bar hinge to provide a pneumatic control signal when the guard bar is
raised. The 5000AIHD valve is to be mounted underneath the left bracket (1). For model
LGH5000 and LGH5000API, the plunger of the 5000AIHD is horizontal and slightly
downward to prevent the water and debris from getting into the valve. For LGH5000-001,
the 5000AIHD is mounted vertically and will switch the air as soon as the guard bar is lifted.
The 5000AIHD and mounting fasteners are sold separately.
Please check all parts before installation. Contact Dixon Sales & Service if there are any
missing or damaged parts.

DISASSEMBLING AND ASSEMBLING:

1. Remove the tension springs (10) from the left assembly and right subassembly.
Remove the hitch pin clips (11) from the shafts (8). Remove the shafts (8) from the
left bracket (1) and the right bracket (3). Remove the arms (2 and 4) from the
brackets (1 and 3). Push and hold the locking rod (21) to unlock the left arm (2) when
removing the left arm (2). Remove the spacers (9), the O-rings (20) and the bearings
(18) from the arms (2 and 4). For the left arm (2) of LGH5000 and LGH5000API,
remove the Nylon locknut (13), the shoulder bolt (15), the roller (12), the wave
washer (16) and the flat washer (17). Collect all loose parts for re-installation.
2. Mount the brackets (1 and 3) onto the tanker structure or API flange. Weld the guard
bars or tubes onto the arms (2 and 4). The customer is responsible for selecting and
installing the proper guard bar tube size, and hinge alignment during drilling, welding
and installation.
3. For the left arm (2) of LGH5000 and LGH5000API, install the roller (12), the shoulder
bolt (15), the wave washer (16), the flat washer (17) and the Nylon locknut (13).
Apply grease to the roller (12) and the shoulder bolt (15). Tighten the Nylon locknut
(13) by wrenches. For all models, install and tighten the grease fittings (19) onto both
arms (2 and 4) by a wrench. Install the bearings (18), the spacers (9) and the O-rings
(20) back into the arms (2 and 4). Install the arms (2 and 4) back onto the brackets (1
and 3) through the shafts (8). Install the hitch clip pins (11). Charge the arms (2 and
4) with bearing grease through the 4 grease fittings (19). A 3/8" OD charging fitting
should be used.
090119 REV1 2017/09/01
877.582.3569
6