djpower DJV PT-1500V Руководство пользователя - Страница 5
Просмотреть онлайн или скачать pdf Руководство пользователя для Туманная машина djpower DJV PT-1500V. djpower DJV PT-1500V 12 страниц.
Fog machine PT-1500 Art.No
Never use solvents or aggressive detergents
Never use solvents or aggressive detergents for cleaning. Use instead of this a
damped cleaning rag.
To prevent damages during transport use for transport the original packing or
To prevent damages during transport use for transport the original packing or
To prevent damages during transport use for transport the original packing or
provided accessories.
For reasons of safety unauthorized changes are forbidden!
For reasons of safety unauthorized changes are forbidden!
A usage of the device which differs from usages which are described in this
A usage of the device which differs fr
manual can cause damages of the device. In this case the warranty expires.
manual can cause damages of the device. In this case the warranty expires.
manual can cause damages of the device. In this case the warranty expires.
Additional you should notice that every different usage is related with
Additional you should notice that every different usage is related with
Additional you should notice that every different usage is related with
dangers and can cause e.g. an electrical short, fire, electric shock or crash.
dangers and can cause e.g. an electrical short, fire, electric shock o
dangers and can cause e.g. an electrical short, fire, electric shock o
2.1. Overhead installation
Overhead installation
Danger of life!
Danger of life!
You have to observe the regulations of BGV C1 (formerly VBG
You have to observe the regulations of BGV C1 (formerly VBG
You have to observe the regulations of BGV C1 (formerly VBG
70) and EN60598
70) and EN60598-2-17 Installations are to carry out by skilled
personnel only.
personnel only.
The suspension devices have to be build and measured so they can
The suspension devices have to be build and measured so they can
The suspension devices have to be build and measured so they can
withstand for an hour the tenfold of the payload without suffering a
withstand for an hour the tenfold of the payload without suffering a
withstand for an hour the tenfold of the payload without suffering a
permanent detrimental deformation.
permanent detrimental deformation.
Basically installation has to be made by using a second separate suspension.
Basically installation has to be made by using a second separate suspension.
Basically installation has to be made by using a second separate suspension.
This can be e.g. a suitable net. The second suspension must be designed an
This can be e.g. a suitable net. The second suspension must be designed and
This can be e.g. a suitable net. The second suspension must be designed an
attached so no part of the installation can fall down in case of failure.
attached so no part of the installation can fall down in case of failure.
attached so no part of the installation can fall down in case of failure.
During construction, reconstruction and deconstruction unnecessary stay in
During construction, reconstruction and deconstruction unnecessary stay in
During construction, reconstruction and deconstruction unnecessary stay in
the range of moving areas, on lightning bridges, under elevated work stations
the range of moving areas, on lightning bridges, under elevated work stations
the range of moving areas, on lightning bridges, under elevated work stations
or any other danger zones i
or any other danger zones is forbidden.
The operator is obliged to following safety
The operator is obliged to following safety-related and mechanical facilities:
• Before the first start
Before the first start-up or after critical changes before restarting it has
to be checked by an expert.
to be checked by an expert.
• Review in the frame of the inspection test at least all
Review in the frame of the inspection test at least all four years by an
expert. .
• Review by a qualified person at least once a year.
Review by a qualified person at least once a year.
How to carry out the overhead installation:
How to carry out the overhead installation:
Ideally the device should be installed outside lounge areas of people.
Ideally the device should be installed outside lounge areas of people.
Ideally the device should be installed outside lounge areas of people.
IMPORTANT! Overhead installation requires a high level of exp
Overhead installation requires a high level of experience. This
includes knowledge of calculating the payload, used installation material
includes knowledge of calculating the payload, used installation material
includes knowledge of calculating the payload, used installation material
and safety inspections of the used material and the projector whereas the
and safety inspections of the used material and the projector whereas the
and safety inspections of the used material and the projector whereas the
required experience is not limited to this. Do not try to carry out installation
required experience is not limited to this. Do not try to carry out installation
required experience is not limited to this. Do not try to carry out installation
yourself under any circumstances if you are not qualified. Contact a
r any circumstances if you are not qualified. Contact a
r any circumstances if you are not qualified. Contact a
professional installer. An inappropriate installation can lead to injuries and/or
professional installer. An inappropriate installation can lead to injuries and/or
professional installer. An inappropriate installation can lead to injuries and/or
damaged properties.
Art.No.: 114082
om usages which are described in this
Installations are to carry out by skilled
up or after critical changes before restarting it has
5 / 12
for cleaning. Use instead of this a
related and mechanical facilities:
four years by an
erience. This