ACR Electronics OLAS CORE Kurulum ve Menzil Testi - Sayfa 2

Aksesuarlar ACR Electronics OLAS CORE için çevrimiçi göz atın veya pdf Kurulum ve Menzil Testi indirin. ACR Electronics OLAS CORE 4 sayfaları. Testing the alarm
Ayrıca ACR Electronics OLAS CORE için: Hızlı Başlangıç Kılavuzu (12 sayfalar), Doğruluk Testi (2 sayfalar), Kurulum ve Menzil Testi (4 sayfalar), Sorun Giderme (2 sayfalar), Manuel (2 sayfalar)

ACR Electronics OLAS CORE Kurulum ve Menzil Testi
Setup and Range Test
FOR FIRMWARE VERSION 2.0+
7. Hold the ACR OLAS tag next to the Core.
9. Open the ACR OLAS App
Core Selection
CORE213
CORE374
Back
Done
11. Select the ID number which relates to your Core, this is located on
the side of the Core box
GET
OLAS
CORE213
8. The Core will double beep to acknowledge the tag is now being
tracked.
10. Connect to the Core
12. Follow the setup instructions to the ACR OLAS app home page. If
you are advised to carry out a rmware update please do so
immediately and ensure you download and read any new
operation instructions.
www.acrolas.com
Device Selection
Please choose which ACR OLAS method
you wish to set up
Back
Done
Menu
Tom
Far
Battery
Track,
Transmitter
Level
Pause
type
Name
Transmitter
proximity
Press to continue
Hold to
Manual
pause
tracking
MOB
MOB