FLO-DYNAMICS TSD450 Hızlı Başlangıç Talimatları - Sayfa 5

Servis Ekipmanları FLO-DYNAMICS TSD450 için çevrimiçi göz atın veya pdf Hızlı Başlangıç Talimatları indirin. FLO-DYNAMICS TSD450 6 sayfaları. Transmission fluid exchange machine with chemical injection

40201043
TSD450 LCDC
QUICK START
Transmission Fluid Exchange
INSTRUCTIONS
Machine with Chemical Injection

ADDITIONAL FUNCTIONS

MAIN MENU
Press 0 at any time to return to the main menu.

PRIMING THE MACHINE

Press 5 to select Prime Machine.
The machine will prompt you to join the red and black
service hoses.
Make sure there is fluid in the new fluid tank.
Connect the red and black service hoses together using
any two mating adapters.
Press the Green Button to begin the process.
The unit will shut off when complete.

DRAINING THE TANKS

From the main menu, press ▼ to proceed to the next
menu. Press 6 to drain the NEW FLUID tank, or 7 to drain
the USED FLUID tank.
To fully drain a fluid tank, press ▼twice from the main
menu. Press 1 to fully drain the NEW FLUID tank, or 2 to
fully drain the USED FLUID tank. After fully draining either
fluid tank, the machine must be primed.
Connect any open-ended adapter to the red service hose
and insert into an appropriate disposal container. Make
sure all other hoses are disconnected!
Press the Green Button to begin the process.
The unit will shut off when complete.
NOTE:
When fully draining a tank, the machine will not
stop automatically when the tank is empty. You must push
the Red Button on the control panel when the machine
begins to pump air out of the red service hose.
Flo-Dynamics, Inc. • 3300 Reedy Drive • Elkhart, IN 46514 • 800-303-5874
Page 5 of 6