FLO-DYNAMICS CMS-120 Hızlı Başlangıç Talimatları - Sayfa 7
Endüstriyel Ekipmanlar FLO-DYNAMICS CMS-120 için çevrimiçi göz atın veya pdf Hızlı Başlangıç Talimatları indirin. FLO-DYNAMICS CMS-120 8 sayfaları. Coolant management system
40201194
CMS-120
QUICK START
Coolant Management System
INSTRUCTIONS
COOLANT FILTER REPLACEMENT
If pressure or a vacuum is shown on either tank gauge,
depressurize the tanks by turning Tank Control and Assist
Control to VENT.
Close the ball valve on the black service hose and connect
the open-end adapter.
Turn Tank Control and Vacuum Control to GREEN and
move the Flow Control to "ON".
Place the open-end adapter into an approved coolant waste
container and open the ball valve.
NOTE: The reservoir will not completely empty and will only
empty past the threads, so the reservoir may be removed
without spillage.
Once at this level, move the Flow Control to "OFF", turn
Tank Control to VENT, and Vacuum Control to OFF.
Remove the reservoir by turning it counterclockwise. Empty
the reservoir contents into an approved coolant waste
container, rinse out the reservoir, and replace the filter if
necessary.
After ensuring the rubber O-ring is in place, reinstall the
reservoir by turning clockwise until seated.
Flo-Dynamics, Inc. • 3300 Reedy Drive • Elkhart, IN 46514 • 800-303-5874
Page 7 of 8