aero pure ABF110DHG5OR Kurulum Talimatları Kılavuzu - Sayfa 9
Fan aero pure ABF110DHG5OR için çevrimiçi göz atın veya pdf Kurulum Talimatları Kılavuzu indirin. aero pure ABF110DHG5OR 15 sayfaları. Bath fan
INSTALLATION I (NEW CONSTRUCTION) CONTINUED
6.
Install a circular duct and secure it with clamps
or ties and seal it with mastic or approved duct tape.
A 4", 5", or 6" circular duct is needed to connect
to relevant part of adaptor. (Fig.6)
7.
Remove the knock-out plate and secure conduit
or wire protector nut to knock-out hole. (Fig.7.
Refer to wiring diagram on page 5.
Using UL approved wire nuts, connect house power
wires to the ventilating fan wires (Fig.7.
attach it to fan body.
IMPORTANT:
Follow all the local electrical safety codes as well
as the National Electrical Code (NEC).
8.Finish ceiling work. Align ceiling hole with the inside
edges of the flange. (Fig.8)
IMPORTANT:
After finishing the ceiling work, fill gap between
flange and ceiling with caulk or other sealant to
prevent air leakage.
I
)
II
), then
Unit:inches(mm)
Caulk
Circular duct
Duct tape
I
Attach cable clamp to Knockout
Plate. Knockout Plate mounts to
outside of Housing and may be
oriented as desired.
Nuts
II
Connect
wires
White
Black
Red
Green
Wire nuts
Ceiling
Fig.6
III
IV
Screw from
Parts Bag
Fig.7
Fig.8
9