Bobrick 1033 Kurulum Talimatları Kılavuzu - Sayfa 4
Tuvaletler Bobrick 1033 için çevrimiçi göz atın veya pdf Kurulum Talimatları Kılavuzu indirin. Bobrick 1033 10 sayfaları. Urinal screens, benches & shower seats
STEP 1
POST-TO-CEILING URINAL SCREENS
LAYOUT EXAMPLE.
Finish Face of Wall
5/8"
16mm
Top View
STEP 2
INSTALL ALL ANCHORS
FLOOR AND CEILING ANCHORS.
A. Drill 3/8" (9.5mm) diameter hole to depth shown. Remove all loose material from hole.
B. Insert anchor into drilled hole. Stud to be 2-1/2" (65mm) above floor.
C. Use 9/16" (14mm) wrench to tighten hex nut until anchor is expanded. Make sure shoe retainer is in proper position to
accept shoe. Angled ends to face front and rear of urinal screen.
D. Install second hex nut.
E. Place base plate over threaded rod.
NOTE: Wood-floor anchors are available upon request.
Fig. 2a: Detail of Floor Anchor.
2-1/2''
65mm
3-1/2''
90mm
For tile or concrete floors
using filler sleeve
Page 4
Form No. 1045-69 r5/21/14
Cut to
2-1/2''
4-3/4''
65mm
120mm
Overall
2''
50mm
Min.
For tile or concrete floors
without filler sleeve
© 2014 Bobrick Washroom Equipment, Inc.
A. Refer to Bobrick layout sheets for distance location on
screen depth.
B. From back wall, measure and mark the location of the
edge of the screen.
C. Centerline of floor anchor from edge of screen is 5/8"
(16mm).
D. Be sure, by plumb line, that floor and ceiling holes are
in line.
LEGEND:
Obtain Dimension from Bobrick Layout Sheet.
Mounting holes to be drilled.
Fig. 2b: Detail of Ceiling Anchor.
Spacer
Printed in U.S.A.
Drill 1/2'' (
) Hole in Ceiling.
12mm
Run Toggle Bolt through
Base Plate and Spacer, then
into Ceiling. Tighten securely.
Finish Face of Ceiling
Base Plate