Euro Towers A10520 Montaj Talimatları - Sayfa 2

İnşaat Ekipmanları Euro Towers A10520 için çevrimiçi göz atın veya pdf Montaj Talimatları indirin. Euro Towers A10520 2 sayfaları.

The Step Fold Podium 3
Assembly Instructions
Ensure all parts are present and are not damaged before
assembling
Kit List- Podium 3
4 x K548 - 5" Castors
1 x SFP3 - Stepfold 3 Podium Base Unit
1 x SFSP/3 - Step Platform
1 x SFPP/3 - Main Platform
1 x SFCL - Stepfold 3 Clip in Ladder
2 x SFDB - Stepfold 3 Diagonal Brace
2 x SFST/3 - Stepfold 3 Stabilizers
Platform Height
Safe Working Load
Dimensions
Unit Weight C/W Stabilizers
Step by step guide
1. Open the unit on a
2. Fit the main platform on
firm and level base
the B'h rung as shown
lock the folding gate
section.
7. Fit the step platform
9. Fit stabilizers
at the base of the unit
as shown.
Always work on the podium with the knuckled gate facing the work area
When leaving the podium, always descend, facing the knuckled gate
Stepfold Podium 3
2m
150Kg
0.9m x 1.2m
56Kg
3. Ensure that the
castors are in the braked
position
10. Access the platform
using the step platforms
and ladder, keeping
contact with the unit at
all times.
• STABILIZERS MUST BE USED AT ALL TIMES
• THIS UNIT IS SUPPLIED WITH 4 CASTORS AS STANDARD
4. Fit a diagonal brace
5. Repeat this process
from the 1 ' 1 to 3,d rung
on the front of the unit
of the podium at the
in the opposite direction
back of the unit.
as shown.
11. Once the platform is
12. The gate can be
accessed, extend the
extended simply by
gate to its full length and
releasing the button.
close.
Once the gate is in the
designated place the
button will automatically
lock into place.
8. Fit the ladder 1 rung below
the working platform.
Pivot the rung until the hook
is facing downwards and clip
into place.
PLEASE NOTE:
To remove the ladder,
release the bottom catches
and turn the hooks
towards you.
This will enable the top to
be removed.