3 INSTALLATION INSTRUCTIONS
The DOMUSA TEKNIK Silo must be installed and assembled by sufficiently qualified personnel,
observing the relevant personal safety regulations and the warnings given in the "Warnings and Safety
Instructions" section of this manual and complying with the applicable national, regional and local
regulations in force at the time and place of installation. In particular, the relevant building
construction and fire protection codes, standards and regulations must be observed.
3.1
Location and ventilation of the premises
For correct storage and durability, we recommend installing the Silo in covered premises expressly
provided for it, inside a building. If it is installed outdoors, it must be sheltered and protected from
the weather, particularly from rain, as if the pellets become wet they will be unusable.
Both the construction and the fire protection of the walls, roof and door of the premises used for
the Silo and the boiler room must comply with the applicable local building and fire protection
regulations. The base or floor the Silo stands on must be built to withstand at least 1600 kg at each
point of support.
The premises in which the Silo is located must have sufficient ventilation, with at least one direct
ventilation outlet to the outside of the building with a minimum surface area of 170 cm
at the highest part of the premises. If the canvas Silo is located inside a building, both the Silo filling
hose and the ventilation system of the premises must lead to the outside, complying with the
minimum dimensions throughout their entire run. Also, the room in which the pellet boiler is
located must have direct ventilation to the outside with a surface area of at least 200 cm
Therefore, if the Silo is installed in the same premises as the boiler, the minimum ventilation area
required will be 200 cm
Although a normal degree of damp on the walls of cellars, basements and the type of premises
habitually used for pellet Silos will pose no problems for optimum pellet storage, you should
prevent the canvas walls of the Silo from remaining in permanent contact with the walls of the
premises. Excessive damp or water dripping into the Silo will cause the pellets to swell and
decompose, making them unusable as Bioclass boiler fuel.
The premises must be of a sufficient size to enable assembly, dismantling and maintenance of the
Silo. We recommend leaving a free space of at least 10 cm around the Silo for this purpose. A free
space of at least 30 cm should also be left on the filling nozzle side. The height of the premises
should be at least 25 cm higher than the minimum height of the Silo.
4
2
.
2
, preferably
2
.