American Standard TOWN SQUARE 2742 Kurulum Kılavuzu - Sayfa 10
Küvetler American Standard TOWN SQUARE 2742 için çevrimiçi göz atın veya pdf Kurulum Kılavuzu indirin. American Standard TOWN SQUARE 2742 17 sayfaları. American standard bathing pool installation guide
Ayrıca American Standard TOWN SQUARE 2742 için: Parça Listesi (1 sayfalar), Şartname Sayfası (2 sayfalar)
DRAIN CONNECTION
1. Remove and identify all drain components as defined in air bath drain illustration.
2. Find 1" schedule 40 PVC pipe, see pipe chart, HORIZONTAL DRAIN PIPE.
Mark as "horizontal pipe", drain to elbow section.
3. Find 1" schedule 40 PVC pipe, see pipe chart, VERTICAL DRAIN PIPE.
Mark as "vertical pipe", drain to elbow section.
4. Install drain from below unit through opening as shown in photo A.
A.
5. Apply 3 or 4 pea sized dabs of 100% silicone sealant to bottom waste drain flange and press flat rubber gasket into place
as shown in photos B and C.
B.
6. Apply 1/" continuous bead of 100% silicone sealant to flat rubber gasket as shown in photo D. Set aside and be sure not to
disturb silicone bead.
D.
7. Apply 1/" continuous bead of 100% silicone sealant to back side to metal strainer as shown in photo E. Press
Strainer retaining bolt into metal strainer and insert into drain hole of acrylic bath.
E.
754063-100 Rev. B
MODEL
C.
10
PIPE CHART
VERTICAL
HORIZONTAL
PIPE
74
10.50"
74
1.00"
70
11.00"
3571
1.75"
357
1.50"
3573
1.75"
3574
1.5"
3575
1.50"
PIPE
6.50"
6.50"
4.75"
5.75"
6.00"
5.75"
5.75"
5.75"