Installing the automated system

Preliminary checks
For the safety and correct operation of the automated system, ensure that the following conditions are met:
The gate structure must be designed to be automated. In particular, the diameter of the wheels must conform to the weight of
the gate being automated, there must be a guide on top and mechanical limit switches sized to suit the weight and speed of the
movable leaf, to avoid derailment of the gate;
Initially, leave at least 10 cm of clearance between the movable leaf stopping points (open and close) and the mechanical
stops of the gate. The final adjustment is made once the inverter programming precedure is completed.
Minimum distance 3 cm.
The gate sliding rail must be linear and horizontal.
Manual movement of the gate must be smooth along the entire stroke.
The characteristics of the ground must guarantee sufficient solidity of the foundation plinth.
No tubes or electrical cables should be present in the plinth digging area.
If the gearmotor is exposed to vehicle transite, provide for adequate protection against accidental impact, when possible.
Ensure that there is an efficient earth plate for connecting the gearmotor.
Should various elements not need the above-mentioned conditions, adjust them so they do.