DoorKing 2112 Kurulum ve Kullanım Kılavuzu - Sayfa 8

Kontrol Sistemleri DoorKing 2112 için çevrimiçi göz atın veya pdf Kurulum ve Kullanım Kılavuzu indirin. DoorKing 2112 18 sayfaları. Internet/cellular programmable video telephone/access control system

DoorKing 2112 Kurulum ve Kullanım Kılavuzu
Prior to beginning the installation, we suggest that you become familiar with the instructions, illustrations, and wiring
guide-lines in this manual. This will help insure that your installation is performed in an efficient and professional manner.
Installation of the 2112 involves the installation of the hardware and the wiring of these components. Be sure that all dirt, metal
or wood debris is removed from inside after mounting it. Any debris inside could damage the control board and cause the 2112
system to malfunction during operation.
When the 2112 is used to control a vehicular gate with an automatic gate operator, it must be mounted a minimum of
six (6) feet away from the gate and gate operator, or in such a way that a person cannot operate the 2112 system
and/or touch the gate or gate operator at the same time.
WARNING
Included with the system is an extra random keyed cabinet lock. If desired, for added security against unauthorized entry into the system,
the standard lock may be replaced with the random lock. Note: DoorKing cannot replace this specific lock or keys if lost.

1.1 Standard Internet Installation ONLY

A Cat5 wire will need to be run to the 2112 installation location that is ALREADY connected to the internet, then installation can begin.
Typical Internet Source
Internet
Your internet
DSL/Cable modem
connected to your
internet service
provider.

1.2 Optional Cellular Installation ONLY

An existing cellular phone will be needed to test the signal strength of DoorKing's
cellular network in the desired installation location (a smart phone is preferred).
BEFORE the 2112 cellular module can be installed, the installation location MUST BE TESTED
for good cellular signal strength for reliable communication.
TEST this location using an existing active T-Mobile cellular phone ONLY.
DO NOT install the cellular module in a WEAK or NO signal area.
Activate the phone near the position where you want the cellular module to be installed. 3-4
bars of signal strength should be indicated on the phone for a reliable signal. If 3-4 bars are
not achievable in that specific location, then try moving the phone around and see if at least
3-4 bars can be achieved and maintained in a nearby location.
If a smart phone is being used, try using the browser to
connect to a website to verify good data transfer. Generally, the
higher the cellular module is mounted, the better the reception.
This also helps protect against vandalism. The cellular module
should be located as close as possible to minimize the wire
run. This allows less chance for lightning surges or other
electrical interference to disrupt the cellular signal. Keep the
cellular module away from any metal. This can also disrupt the
signal. After the 3-4 bar signal strength has been confirmed
(and the smart phone has good browser data transfer if used
for signal testing), the installation can begin.
4

SECTION 1 - INSTALLATION

Your Router
Cat-5 Cable
Not included
325 ft Max.
Surface Mount: Cellular
module works inside plastic
enclosure. The cellular module
can be mounted outside the
enclosure if desired because
signal strength is a problem.
Avoid any metal around
module. DO NOT expose
module to weather.
Flush Mount: Cellular module needs
to be mounted outside metal
enclosure in a protected secure area
as high as possible for best reception.
Avoid any metal around module.
DO NOT expose module to weather.
See pages 7 & 8.
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
0 0
See page 10 for 2112 Cat5 connection.
1 1
2 2
a r
4 4
3 3
l l u l
5 5
7 7
6 6
C e
8 8
l e
9 9
d u
0 0
M o
1 1
2 2
4 4
3 3
5 5
7 7
6 6
8 8
9 9
0 0
Cellular
Module
2112-065-G-12-21