Air Fantastic CAP5000 Kullanıcı El Kitabı - Sayfa 8
Hava Temizleyici Air Fantastic CAP5000 için çevrimiçi göz atın veya pdf Kullanıcı El Kitabı indirin. Air Fantastic CAP5000 16 sayfaları. Central air purifier (cap)
CAP System Placement Recommendations
•
Above coils - The CAP System unit should be mounted directly above the
coils with UV Shields rotated 90˚ to the open position. The unit should be ori-
entated so that the UV light shines directly on the coils ("air flow" label should
be pointing at the coils). Larger air handlers may require multiple units.
•
Reduce contaminants in duct- In residential or light commercial applications
a single unit can be mounted in the plenum on the supply side of the HVAC
system. In large commercial applications air can become recontaminated as
it travels through the ducts. Therefore it may be necessary to mount several
units throughout the duct. The UV Shield can be rotated to the closed position
when installing the unit in close proximity to seals and gaskets or electrical
components to protect them from the UV rays. When Rotational UV Shields
are in the closed position the CAP System should be installed with the "air
flow" label running parallel with the duct ensuring air flow through the device.
•
When possible, the UV Shield should be rotated the open position for optimal
efficiency to expose more contaminants to UVC radiation.
•
Reduce airborne contaminants in a room - The CAP System unit should
be installed in close proximity to the air outlet vent that supplies air to the
room being treated. The UV Shield should be rotated to the closed position to
prevent human exposure to UV rays. When Rotational UV Shields are in the
closed position the CAP System should be installed with the "air flow" label
running parallel with the duct ensuring air flow through the device.
•
Coverage - As a general recommendation the CAP3000 should be used in
areas up to 3000 square feet and the CAP5000 should be used for areas
between 3000 and 5000 square feet. Areas of higher contamination, areas
above 5000 square feet or with ceilings above 10 feet may require additional
units for best results.
Purified air
The duct work is trans-
formed into one big Puify-
ing Chamber when the
CAP System is installed.
CAP System
Contaminated air
Blower forces air through
ducting (reaction chamber)
6
Purified air