Ameson MINI AIR EASi 2 El Kitabı - Sayfa 4
Laboratuvar Ekipmanları Ameson MINI AIR EASi 2 için çevrimiçi göz atın veya pdf El Kitabı indirin. Ameson MINI AIR EASi 2 4 sayfaları. Air cushion system
Easi handbook ...
b) Roll film bypasses S line support shaft (picture 5)
c) When the film reached the roller, press still (hold on) the
IN/OUT button, the film will go through itself.
d) Check whether the film is set into the blowing port, and
press the "START\STOP" button to start work. (picture 5)
picture 5
Data Setting
1
2
3
4
IN/OUT
START/STOP
picture 6
in/out
Start/Stop
Adjust the temperature using the + and – button
on the left side of the panel.
Adjust the air volume using the + and – button
on the right side of the panel.
3
Recommended parameter
Wrapper
bubbles
bubble wave
tube wave
tube multi
tube small
tube large
Filler
200x100mm
200x130mm
200x150mm
200x200mm
TEL:+86-400-700-6166
6
5
Easi handbook ...
4
FAN
38
38
38
38
Video for Operation
and Maintenance
35
30
FAN
17
16
16
E-handbook
15
Better Cushion
Better Protection
www.cushionpak.com
Version 2019