Akw Level Best Kurulum ve Kullanıcı Bakım Talimatları - Sayfa 5

Duş Kabinleri Akw Level Best için çevrimiçi göz atın veya pdf Kurulum ve Kullanıcı Bakım Talimatları indirin. Akw Level Best 16 sayfaları. Deflector screen

Ensure the wall surface is
finished, level and capable
of supporting the screen.
Drill the wall through the
centre of the slots with a
6mm tile or wall masonry
drill bit and insert wall
plugs.
Use masking
TIP
tape to drill on
tiled surfaces.
Do not silicone
TIP
between the wall
profile and the wall
as further adjustment may
be required.
Only seal the entire
enclosure after installation.
See page 15
© 2016 AKW
Technical Help line
01905 560219
X4
Ensure there are no buried pipes
X4
4x35mm
5

Wall profile installation

Deflector Screen Instructions
www.akw-ltd.co.uk
i
WARNING -
or cables before drilling.
Ensure the fixing holes are to
i
the inside of the enclosure.
Ensure profile
is vertical by
using the
profile slots
for finer
adjustment.
15-010-048-01