DAEHAN STAR RGB C04 Kullanıcı Kılavuzu - Sayfa 3

Aydınlatma Ekipmanları DAEHAN STAR RGB C04 için çevrimiçi göz atın veya pdf Kullanıcı Kılavuzu indirin. DAEHAN STAR RGB C04 4 sayfaları. Super bright s-led module

User Guide
INSTALLATION GUIDE
STAR RGB C04
1. DETERMINE LAYOUT
Channel Depth
Refer to 'LAYOUT DENSITY GUIDELINES' on page 2 to
determine spacing and amount of LEDs required.
2. PEEL AND STICK
Using predetermined layout and LED placement
from step 1, remove 3M tape on the back of modules
and stick them into place. Ensure modules are firmly
attached on the surface.
4. CONNECT WITH POWER SUPPLY & TEST
RGB Controller
Using predetermined layout and LED placement
from step 1, divide channels into sections and
distribute each section to corresponding power
supplies.
CAUTION
Before connect with power supplies, check
polarity on every connections
6. CHECK LIGHTS AND SPOTS
RGB Controller
DAEHANTRANS CO.,LTD
#7-11 Songdo-Dong, Yeonsu-Gu, Incheon, Korea
Tel. +82 32 858 0491 Fax. +82 32 832 8421 [email protected] / www.daehantrans.com
Attention to : John Doe
Stroke Width
1000 mm
Information
SUPPORTS FOR OUR SIGNMATES
Ask us to obtain accurate layout
3. CAP ALL UNUSED WIRES
The strand of modules should not be looped to
create a closed circuit.
5. FIX MODULES PERMANENTLY
FASTENERS : If desired, modules can be secured
with M2.5*15 metal screws.
SILICON : If desired, modules can be secured with
silicon. Do not to put silicon on the top of the LED
lamps.
SET CONTROLLER TO STATIC WHITE MODE
1. Push and hold 'MODE' button for 3 seconds to switch to
static mode. Indicator on R, G, or B should be on.
2. Use 'UP' and 'DOWN' button to set all numeric values of
R, G, B to '255' . Modules should have static white color now.
3. Check for dark spots on all channels
MATERIAL ESTIMATE
34
6
22
34
RAINBOW C04 x 143
NUMBER OF SET
1
Model
Color
Quantity
Power Supply
Quantity
QUANTITY PER SET
143EA
STAR C04
WHITE
143EA
DC12V 120W
2
TOTAL CLUSTERS
143EA
WATTAGE PER SET
187W
TOTAL WATTAGE
187W
MODULE PITCH
120mm
*This is for estimating purposes only. Material Estimates for S-LED system are based upon given font, letter height, depth, face material, and any special instructions.
*Missing information will affect the final results
*All signs should be tested for acceptable color, illumination and operation. Use appropriate power supply for testing
*For detailed information, please refer to the applicable S-LED product found under http://www.daehantrans.com/download/products2007.pdf
Wire Nut
CAUTION
When handling the module, avoid pressing
down directly on top of LED lamp
3
Page 1 of 1
41
Drawn by Brad Han
Date : 2009. 1. 1.
Tel : +82 32 858 0491
Fax : +82 32 832 8421
Rev. 0
www.daehantrans.com
*Power consumption is calculated with extra 15% for extended life of power supplies