Dormakaba 8600 FHJ Kurulum Talimatları Kılavuzu - Sayfa 4
Kapı açma sistemi Dormakaba 8600 FHJ için çevrimiçi göz atın veya pdf Kurulum Talimatları Kılavuzu indirin. Dormakaba 8600 FHJ 9 sayfaları. Friction hold open for regular, top jamb and parallel mounts
![Dormakaba 8600 FHJ Kurulum Talimatları Kılavuzu](/uploads/products/server2/1196947/1196947.png)
dormakaba 8600 FH/FHJ/FHP Installation Instructions
2
Installation - regular mount
2.1 Surface closer system
Fig.2
1. Door closer
2. Connecting arm
3. Bar and shoe
4. Dust cap
5. Flat head combo screws
6. Pan head combo screws
7. Pinion screw
8. Connection arm screw
2.2 Installing the surface closer and (optional) backplate
Fig.3
RH
C
L
NOTE: Orient pinion toward hinge.
2.2.1 Secure closer body and/or backplate to door.
2.3 Installing main arm
Fig.4
Friction hold
open arm
A
C
L
RH
8600 Surface Applied Closers
4
7
RH
5
Opening
LH
to 100°
100° to
120°
L C
over
120°
RH
Nut
B
B
90°
C
C
08279004
8
3
6
3
8
7
2
9
2
1
4
6
4
"A"
7-7/8"
[200]
1-7/8"
[48]
6-7/8"
BP86
"A"
[175]
4-3/8"
[111]
2.3.1 Secure the friction hold
LH
open arm to the door.
•
Right hand - nut facing
upwards
•
Left hand - nut facing
downwards.
A
Regular mount
1
6
Bottom of frame
12
C
L
LH
10-2019