Dover Blackmer LGL3021A Kurulum, Çalıştırma ve Bakım Talimatları - Sayfa 3

Su Pompası Dover Blackmer LGL3021A için çevrimiçi göz atın veya pdf Kurulum, Çalıştırma ve Bakım Talimatları indirin. Dover Blackmer LGL3021A 12 sayfaları. Liquefied gas pumps

Dover Blackmer LGL3021A Kurulum, Çalıştırma ve Bakım Talimatları
NOTICE:
Blackmer pumps must only be installed in systems
designed by qualified engineering personnel.
design must conform with all applicable regulations and
codes and provide warning of all system hazards.
NOTICE:
This pump shall be installed in accordance with the
requirements of NFPA 58, all applicable local, state and
national regulations.

WELDED CONNECTIONS

NOTICE:
Pumps with welded connections contain three non-
metallic O-ring seals that will be damaged if welding is
done with these O-rings installed.
Prior to welding the piping, remove the O-rings from under the
inlet flange, outlet flange and relief valve cover as indicated in
Figure 1.
Reinstall the inlet and outlet flanges. Weld the piping to the
the inlet and outlet flanges. After the welding is complete,
reinstall the O-rings.

PRE-INSTALLATION CLEANING

NOTICE:
New pumps contain residual test fluid and rust inhibitor.
If necessary, flush pump prior to use.
Foreign matter entering the pump WILL cause extensive
damage. The supply tank and intake piping MUST be
cleaned and flushed prior to pump installation and operation.

GENERAL INSTALLATION AND OPERATION

Figure 1

LOCATION AND PIPING

Pump life and performance will be significantly reduced when
System
installed in an improperly designed system. Before starting
the layout and installation of the piping system, review the
following suggestions:
1.
Locate the pump as near as possible to the source of
supply to avoid excessive inlet pipe friction.
2.
The inlet piping and fittings should be at least as large as
the intake port on the pump. Slope the pipe downward to
the pump, and do not install any upward loops. Minimize
the number of intake line fittings and eliminate
restrictions such as sharp bends; globe valves,
unnecessary elbows, and undersized strainers.
3.
A strainer must be installed in the inlet line to protect the
pump from foreign matter. Locate the strainer at least 24"
(0.6m) from the pump. Strainers must have a net open
area of at least four times the area of the intake piping,
and must be cleaned regularly to avoid pump starvation.
4.
The intake and discharge piping system must be free of
all leaks.
5.
Expansion joints, placed at least 36" (0.9m) from the
pump, will compensate for expansion and contraction of
the pipes. Contact the flexible connector/hose
manufacturer for required maintenance/care and design
assistance in their use.
ALL piping and fittings MUST be properly supported to
6.
prevent any piping loads from being placed on the pump.
7.
Check alignment of pipes to pump to avoid strains which
might later cause misalignment. See Figure 2. Unbolt
flanges or break union joints. Pipes must not spring away
or drop down. After the pump has been in operation for a
week or two, completely recheck alignment.
8.
Install pressure gauges in the NPT ports provided in the
pump casing to check pump performance at start up.
9.
The use of a 1.5" or 2" vapor return line will speed up
delivery by preventing pressure build up at the receiving
tank and pressure reduction in the supply tank.
10. Keeping the liquefied gas systems full of liquid, even
when idle, will keep the O-rings from changing shape,
shrinking or super cooling. Evaporation of liquefied gas
leaves an abrasive powder on the surface which can
cause wear to the pump, meter, and seals.
501-L00
Page 3/12
Figure 2