Follett HMC1010WBS Kurulum Talimatları Kılavuzu - Sayfa 10

Buz Yapıcı Follett HMC1010WBS için çevrimiçi göz atın veya pdf Kurulum Talimatları Kılavuzu indirin. Follett HMC1010WBS 17 sayfaları. Ice storage bins

Follett HMC1010WBS Kurulum Talimatları Kılavuzu
Connect louvered docking assembly to ice
machine.
• Plug must be accessible after final installation.
• H_E1410A/W 230/50/1 requires a 20A circuit (4.00 mm
Air-cooled ice machines – follow steps 7.1 through 7.5.
7.1
Ice transport tube
• Slide ice machine into louvered docking
assembly ensuring that drain tube is fully
seated on barbed drain fitting
• Insert ice transport tube all the way into
coupling and tighten nut firmly
7.3

Power cord

• Remove twist tie
• Carefully pass cord thru opening and plug
into wall outlet
• For H_E units, install a suitable plug
10
CAUTION
2
wire)
self-contained

Internal connections

7.2
Potable water and drain lines
• Insert potable water line into valve
7.4
Power cord
• Position plate into opening and secure
with supplied screw
BIN • RIDE Technology
7