Dowco X24RS Kurulum Talimatları
Tekne Ekipmanları Dowco X24RS için çevrimiçi göz atın veya pdf Kurulum Talimatları indirin. Dowco X24RS 5 sayfaları. 2018-2019 g3 full / front enclosure / double canopy
INSTALLATION INSTRUCTIONS
2018-2019 G3 Full / Front Enclosure / Double Canopy
X24RS
PARTS LIST
1 Bow Canopy Frame (Figure 3)
1 Bow Canopy
1 Bow Canopy Boot
1 Aft Curtain
1 Aft Canopy with Zippers
1 Aft Canopy Boot
2 Aft Side Curtains (1 Port, 1 Starboard)
2 Bow Side Curtains (1 Port, 1 Starboard
2 Aft Side Extension Curtains (1 Port, 1 Starboard)
1 Extended Aft Frame (Figure 4)
1 Extended Aft Canopy
1 Bow Curtain
1 Extended Aft Canopy Boot
PARTS LIST
Measuring Tape
Center Punch
Drill
5/ 1 6" Drill Bit
Pencil
Phillips Screwdriver
2 Sets SAE allen wrenches
WARNING
Indicates potential hazard that
could result in death or injury.
Dowco Marine, Inc. | 1610 Frisco Drive, Lebanon MO 65536 | dowcomarine.com | (800) 404-5252
BOW HARDWARE PACKAGE
2 - "H" Brackets (1 1/4")
4 - 1/4"-20 Barrel Nuts
2 - 1/4"-20 Short Shoulder Bolts
2 - Deck Buttons w/ 1/4"-20 x 1.5" Bolt
2 - 5/ 1 6 x 2" Bolts
2 - Lock Washers
2 - 5/ 1 6" Tri Wing Knob
4 - Plastic Shoulder Washers
8 - Self Drill Scews
AFT HARDWARE PACKAGE
2 "H" brackets (1 1/4")
4 1/4" - 20 Barrel Nuts
2 1/4" - 20 Short Shoulder Bolts
2 Deck Buttons w/ 1/4" - 20 x 1.5" Bolt
2 5/ 1 6" x 2 Bolts
2 Lock Washers
2 5/ 1 6" Tri Wing Knob
4 Plastic Shoulder Washers
8 Self Drill Screws
CAUTION
Indicates potential hazard that
could result in boat damage.
NOTE
Indicates special information to make
maintenance easier or instructions
clearer
140133-00 | 02/19