Follett Horizon Elite Chewblet 1410 Series Kurulum Talimatları Kılavuzu - Sayfa 9

Buz Yapıcı Follett Horizon Elite Chewblet 1410 Series için çevrimiçi göz atın veya pdf Kurulum Talimatları Kılavuzu indirin. Follett Horizon Elite Chewblet 1410 Series 16 sayfaları. For drop-ins
Ayrıca Follett Horizon Elite Chewblet 1410 Series için: Manuel (8 sayfalar), Kurulum Talimatları Kılavuzu (17 sayfalar), Manuel (8 sayfalar)

Follett Horizon Elite Chewblet 1410 Series Kurulum Talimatları Kılavuzu
Connect utilities to docking assembly.
6.1
Water and drain
silicone tubing
3/4" barb x 3/4" FPT
3/4" MPT x 1" slip
1" Stand pipe/Drain
• Rough-in ice machine potable water
supply
.
3/8" push-in connection will be made at
shut-off valve inside machine
• Remove access panel if necessary
• Connect the silicone tubing to the ice
machine 3/4" drain barb
• Assemble the 3/4" barb x 3/4" FPT to the
3/4" MPT x 1" slip. Connect the other end
of the silicone tubing to the 3/4" barb
• Connect the 1" slip fitting to the 1" stand
pipe/drain
.
Note: Minimum 8" radius on silicone
drain line. Drain line from the ice machine
must have at least 1/4" per foot pitch
(6,4 mm/0,3 m).
• Apply Petrol-gel to barbed drain fitting
• Replace access panel.
BIN • RIDE Technology
Minimum 8"
radius
2 ft. x 1" OD
.
.
.
remote condensing

External connections

6.2
Refrigerant lines
• Braze supplied quick-connect lines onto
stub-ins
.
6
9