Follett Horizon Elite HCD1410RJS Kurulum Talimatları Kılavuzu - Sayfa 6
Buz Yapıcı Follett Horizon Elite HCD1410RJS için çevrimiçi göz atın veya pdf Kurulum Talimatları Kılavuzu indirin. Follett Horizon Elite HCD1410RJS 17 sayfaları. Ice machine models with ride technology
installation instructions for drop-ins
Ayrıca Follett Horizon Elite HCD1410RJS için: Manuel (8 sayfalar), Manuel (8 sayfalar)
Prepare the dispenser.
2.1
3.1
Dispenser preparation
4"
(101,6mm)
• Determine best route for ice transport tube run. Note: 12" (304,8mm) clearance is required.
• Drill 1 3/4" (44,5mm) hole through either side of dispenser
• Install gasket
➋
onto bulkhead fitting
• Attach bulkhead fitting with flat up
• Position and secure nut locking plate
• Verify installation of O-ring on stainless steel ice transport tube coupling
• Insert stainless steel ice transport tube coupling
cap
➑
• Heat end of transport tube in cup of 160 F (71 C) hot water to soften and spread with pliers
before making connection to ease assembly
• Attach ice transport tube to coupling with supplied hose clamp
6
➌
➍
and tighten bulkhead nut
➏
with supplied screws
➐
into bulkhead fitting and secure with coupling
remote condensing
Dispenser preparation
Hot Water
160 F (71 C)
12"
(304,8mm)
min.
➊
➎
➐
➓
DROP-IN • RIDE Technology
3
➒