Follett Horizon Elite HCD1810NMS Kurulum Talimatları Kılavuzu - Sayfa 6

Buz Yapıcı Follett Horizon Elite HCD1810NMS için çevrimiçi göz atın veya pdf Kurulum Talimatları Kılavuzu indirin. Follett Horizon Elite HCD1810NMS 17 sayfaları. For ice manager diverter valve
Ayrıca Follett Horizon Elite HCD1810NMS için: Hızlı Başlangıç Kılavuzu (8 sayfalar), Manuel (8 sayfalar)

Follett Horizon Elite HCD1810NMS Kurulum Talimatları Kılavuzu
Install the louvered docking assembly.

BEFORE PROCEEDING

Prior to installing the louvered docking assembly, ensure that the
drain fitting is oriented (right or left) correctly for your installation.
An optional straight drain fitting is also supplied. You may need to
remove the back panel of the docking assembly in order to re-orient
or change the drain fitting. Replace back panel prior to mounting the
docking assembly.
Wall bracket accessory
• Mount louvered docking assembly to wall
bracket accessory
2.1
3.1
Louvered docking assembly
2" (50,8 mm)
3/8˝ ∅
high pressure
line
7/8" ∅ low pressure line
• Mount louvered docking assembly
• "Rough-in" the refrigerant piping
6
1.81" (46 mm)
2" (50,8 mm)
Stub Typ
3.75" (95.3 mm)
Louvered docking assembly
Machine stand accessory
• Mount louvered docking assembly to
machine stand accessory
remote condensing
ICE MANAGER
3