Follett Horizon Elite HCD710AJS Kurulum Talimatları Kılavuzu - Sayfa 11
Buz Yapıcı Follett Horizon Elite HCD710AJS için çevrimiçi göz atın veya pdf Kurulum Talimatları Kılavuzu indirin. Follett Horizon Elite HCD710AJS 17 sayfaları. For drop-in
Ayrıca Follett Horizon Elite HCD710AJS için: Hızlı Başlangıç Kılavuzu (8 sayfalar), Kurulum Talimatları Kılavuzu (17 sayfalar)

Connect louvered docking assembly to ice machine.
• Plug must be accessible after final installation.
• H_E1410A/W 230/50/1) requires a 20 amp circuit (4.00 mm
Air-cooled ice machines – follow steps 7.1 through 7.5.
7.1
Ice transport tube
➋
• Slide ice machine into louvered docking
assembly ensuring that drain tube is fully
seated on barbed drain fitting
• Insert ice transport tube all the way into
coupling and tighten nut firmly
7.3
Power cord
• Remove twist tie
• Carefully pass cord thru opening and plug
into wall outlet
• For H_E units, install a suitable plug
DROP-IN • RIDE Technology
CAUTION
wire)
2
➊
➊
➋
self-contained
Internal connections
7.2
Potable water and drain lines
• Insert potable water line into valve
7.4
Power cord
• Position plate into opening and secure
with supplied screw
7
➊
➊
11