Top of the proofer: a clearance of 12 inches to the ceiling must exist to permit maintenance.
Back and sides: 0 inch clearance.
IN GENERAL
Take off the packaging material with care. Take off all the material used for packing and
accessories.
Each unit is set up to be used with the electrical supply specified on the nameplate fixed on the front
of the unit.
Always LOCK the wheels after installation and use a flexible conduit.
1. To the electrician
Electrical supply installation must be in accordance with the electrical rating on the nameplate and
use flexible wire.
2. To the plumber
MANUAL WATER FILL
No water line is required. Water is filled manually in the pan inside the proofer.
This equipment is to be installed to comply with the applicable federal, state or local plumbing codes.
Connect the steam system (1/4 NPT) to the cold water distribution network. We highly
recommend a water softener to eliminate minerals in the water. We suggest to use CUNO #
A4

DISTANCES TO RESPECT

I N S T A L L A T I O N
CFS6135 (Doyon part number PLF240).