Follett H_C1410WBT Kurulum Talimatları Kılavuzu - Sayfa 7

Buz Yapıcı Follett H_C1410WBT için çevrimiçi göz atın veya pdf Kurulum Talimatları Kılavuzu indirin. Follett H_C1410WBT 12 sayfaları. To ice storage bin top-mount applications

Follett H_C1410WBT Kurulum Talimatları Kılavuzu
4.

External Connections

4.1

Ice Transport Tube Installation

§ Install supplied ice transport tube insulation.
§ Heat end of transport tube in cup of 160 F (71 C) hot water to soften and spread with pliers
connection to ease assembly.
§ Connect ice transport tube to coupling on louvered docking station
§ Connect ice transport tube to shuttle actuator
BIN • TOP-MOUNT
.
.
Horizon 710/1010/1410
Hot Water
160 F (71 C)
before making
7